Storm Water & Sanitary Sewer System Repair, Caserma Miotto, Longare, Italy

SOL #: PAN25386MIOTTOSources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
0414 AQ HQ CONTRACT AUG
APO, AE, 09630, United States

Place of Performance

Longare, Italy

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Sewage And Waste Facilities (Z1ND)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 2, 2026
2
Last Updated
Apr 13, 2026
3
Response Deadline
Apr 21, 2026, 1:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is conducting market research through a Sources Sought Synopsis (SSN)/Request for Information (RFI) to identify potential vendors for Storm Water & Sanitary Sewer System Repair at Caserma Miotto, Longare, Vicenza, Italy. This project involves significant infrastructure upgrades with an estimated magnitude between $10,000,000 and $25,000,000. Responses are due by April 21, 2026.

Project Overview & Scope

The U.S. Army Garrison (USAG) Italy seeks to repair existing failed storm water and sanitary sewer systems. The scope of work, detailed in the draft Statement of Work (SOW), includes:

  • Removing failed piping and installing new storm water and sanitary sewer systems.
  • Constructing a new lamination tank within Comune di Longare property, with a synthetic turf field installed on top.
  • Performing various naturalistic engineering works, such as repairing and stabilizing hillsides experiencing landslides and constructing retention ponds with natural elements.
  • Disconnecting and dividing existing mixed storm and sanitary sewer systems.
  • Creating a new direct piping connection from the Miotto base storm water system to the Bisatto River.
  • Installing new lift stations where gravity flow is not possible.
  • Adhering to all applicable codes and standards, including Italian Norms and cybersecurity requirements for Facility Related Control Systems (FRCS).
  • Managing hazardous materials (asbestos, lead paint) and implementing a Waste Management Plan.

Contract & Timeline

  • Opportunity Type: Sources Sought / Request for Information (Market Research)
  • Anticipated Contract Type: Firm-Fixed-Price
  • Magnitude of Construction: Between $10,000,000 and $25,000,000
  • Anticipated Performance Period: Approximately three (3) years, with an anticipated start date in September 2026.
  • Set-Aside: None specified
  • Response Due: April 21, 2026, at 15:00 hrs Central European Time (CET)
  • Published Date: April 13, 2026 (Amendment extending response date)
  • Place of Performance: Caserma Miotto, Longare, Vicenza, Italy

Requested Information

Interested parties are requested to submit a capabilities statement addressing:

  1. Company Information: Name, Address, Point of Contact (Name, Email, Phone), Unique Entity Identifier (SAM UEI).
  2. Project Experience & Capability: Experience with similar works and construction cost magnitude, capability to manage specialized subcontractors (naturalistic engineering, synthetic turf), and experience performing work in various complex environments (roadways, sloped/wooded areas, public areas).
  3. Management & Staffing: Ability to manage a three-year contract with necessary workforce and key personnel on-site.

Submission Instructions & Contacts

Responses must be submitted via email to elisa.marchetti2.ln@army.mil and stacey.l.miller45.civ@army.mil. The email subject line should be: "Response to Sources Sought: Miotto Sewer Repair_ [Your Company Name]". Clearly identify any proprietary information. Telephone inquiries will not be accepted.

Additional Notes

This is for market research purposes only and does not constitute a Request for Proposal (RFP) or a commitment to award a contract. The government does not intend to award a contract based on this notice.

People

Points of Contact

Stacey MillerPRIMARY
Elisa MarchettiSECONDARY

Files

Files

Download

Versions

Version 2Viewing
Sources Sought
Posted: Apr 13, 2026
Version 1
Sources Sought
Posted: Apr 2, 2026
View
Storm Water & Sanitary Sewer System Repair, Caserma Miotto, Longare, Italy | GovScope