Streambank Stabilization, Old Route 30, Townshend Lake, Townshend, VT

SOL #: W912WJ26QA069Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NEW ENGLAND
CONCORD, MA, 01742-2751, United States

Place of Performance

Place of performance not available

NAICS

Site Preparation Contractors (238910)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 6, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers – New England District has issued a Pre-Solicitation Notice for Streambank Stabilization along the West River in Townshend, VT. This project involves stabilizing 310 feet of streambank and is designated as a Total Small Business Set-Aside. The estimated magnitude of construction is between $25,000 and $100,000. The solicitation is anticipated to be released on or about March 23, 2026.

Scope of Work

The work requires furnishing all labor, materials, and equipment necessary to stabilize three hundred and ten feet (310’;) of streambank along the West River, located in Townshend, VT. This streambank restoration will adhere to the standard practices outlined in the Vermont Rivers and Roads Field Manual.

Contract & Timeline

  • Opportunity Type: Pre-Solicitation Notice (for a construction contract)
  • Magnitude: Between $25,000 and $100,000
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 238910, with a Small Business Size Standard of $19 Million
  • Anticipated Solicitation Release: On or about March 23, 2026
  • Published Date: March 6, 2026

Additional Notes

This is not a request for quotes at this time. Questions regarding the procurement will not be answered during the pre-solicitation phase; interested parties should submit questions to the Contract Specialist after the solicitation and associated documents have been posted. The solicitation will be available online only via SAM.gov, and offerors must have an active SAM.gov registration at the time of submission to be considered responsive.

People

Points of Contact

Files

Files

No files attached to this opportunity