SUCR SECONDARY SEWER LINE INSTALLATION

SOL #: 140P1526Q0049Solicitation

Overview

Buyer

Interior
National Park Service
IMR ARIZONA(12400)
FLAGSTAFF, AZ, 86001, United States

Place of Performance

Flagstaff, AZ

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Maintenance Of Sewage And Waste Facilities (Z1ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 18, 2026
2
Submission Deadline
Apr 16, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service, under the Department of the Interior, is soliciting proposals for the installation of a secondary sewer line at Sunset Crater Volcano National Monument (SUCR) in Flagstaff, AZ. This project, a 100% Total Small Business Set-Aside, aims to service 10 Recreational Vehicle (RV) spots. The contract is a Firm Fixed-Price construction requirement with an estimated magnitude between $25,000.00 and $100,000.00. Offers are due by April 16, 2026, at 12:00 PM local time.

Scope of Work

The project involves the construction of a new sanitary sewer main and services for 10 RV sites. Key deliverables include:

  • Installation of a new secondary sewer line.
  • Construction of a cleanout for the existing apartment building sanitary sewer service.
  • Abandonment of the existing sanitary sewer for the RV sites.
  • Removal and replacement of asphalt and surfacing.
  • Raising a water main where it crosses the new sewer main. All work must be completed by skilled personnel in accordance with industry standards and manufacturer specifications.

Contract Details

  • Contract Type: Firm Fixed Price (Construction Contract)
  • Period of Performance: 90 calendar days after receipt of Notice to Proceed.
  • Estimated Magnitude: Between $25,000.00 and $100,000.00 (IAW FAR 36.204).
  • Payment Bond: Required for offers exceeding $35,000.00, due within ten (10) days of award (IAW FAR 52.223-18).

Eligibility & Set-Aside

This requirement is a 100% Total Small Business Set-Aside (FAR 19.5). Offerors must be registered in SAM.gov with an "active" status.

Submission & Evaluation

  • Proposal Submission: Electronically via email to lindsay_mclaughlin@ios.doi.gov. All quotes must be submitted in PDF format and be valid for a minimum of 60 days.
  • Offer Due Date: April 16, 2026, by 12:00 PM local time.
  • Site Visit: Scheduled for Tuesday, March 24, 2026, at 9:00 AM Mountain Standard Time. Meeting location is the Visitor Center Parking Lot at Sunset Crater Volcano National Monument.
  • Questions Due: Electronically to lindsay_mclaughlin@ios.doi.gov three (3) days after the site visit. Government responses will be posted as an amendment.
  • Evaluation: Quotations will be evaluated impartially, considering those with the highest perceived value based on price, technical capability, and prior experience. Award is subject to the availability of funds.

Contact Information

People

Points of Contact

McLaughlin, LindsayPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Solicitation
Posted: Mar 18, 2026
SUCR SECONDARY SEWER LINE INSTALLATION | GovScope