SUF FR912 Little Isabella River Culvert Replacement

SOL #: 12445526Q0073Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

Tofte, MN

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 3, 2026
2
Submission Deadline
Jul 6, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Forest Service (USFS) is soliciting quotations for the SUF FR912 Little Isabella River Culvert Replacement project on the Tofte Ranger District, Superior National Forest, Minnesota. This opportunity is a Total Small Business Set-Aside with an estimated project magnitude between $500,000 and $1,000,000. Quotations are due electronically by July 6, 2026, at 5:00 PM CDT.

Scope of Work

This project involves the replacement of existing triple corrugated metal pipe arch culverts on Forest Road 912 at the Little Isabella River crossing. The scope includes:

  • Removal of existing timber panel bridging and culverts.
  • Furnishing and installation of two new precast concrete box culverts (24’x12’x5’), headwalls, and wing walls.
  • Installation of rip rap, backfill, geotextile drainage material, and aggregate to final road grade.
  • Installation of permanent bridge signs, seeding, and mulching of disturbed areas.
  • Implementation of traffic control and strict environmental protection measures for the Little Isabella River and associated wetlands.

Critical Restriction: All in-stream work must be performed between June 30th and September 15th due to the river's designation as a trout stream.

Contract Details

  • Type: Firm Fixed Price Purchase Order (RFQ 12445526Q0073).
  • Magnitude: Between $500,000 and $1,000,000.
  • Period of Performance: 424 days after receipt of Notice to Proceed (NTP), with completion anticipated before the end of the FY 2026 construction season.
  • Set-Aside: Total Small Business (NAICS 237310 - Highway, Street, and Bridge Construction, Size Standard: $45M).
  • Wage Determination: DBAWD MN20260231 applies.

Submission & Evaluation

  • Quotations Due: Electronically by 1700 CDT on July 6, 2026.
  • Questions Due: Via email by 1300 CDT on June 24, 2026.
  • Evaluation: Award will be made to the responsive, responsible vendor with the lowest price, based on price reasonableness in accordance with FAR 12.204(a).
  • Requirements: A Bid Guarantee is required. Offerors must review all solicitation materials, including instructions to offerors, as non-compliant or late quotations may be rejected.

Key Attachments & Notes

  • Engineering Plans (Att2-Plans.pdf): Provides detailed design, site conditions, and traffic management requirements.
  • Supplemental Specifications (Att4-Specs.pdf): Modifies standard construction specifications (FP-14) for this project.
  • Fillable Schedule of Items (Att6-FillableSOI.xlsx): Must be completed for pricing all required components and Option 1 (Flexible Baffle).
  • No formal site visit will be held; offerors are urged to inspect the site independently.
  • Point of Contact: Matthew (Matt) Killian, Contracting Officer, at matthew.killian@usda.gov.

People

Points of Contact

Matthew (Matt) KillianPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jun 3, 2026
SUF FR912 Little Isabella River Culvert Replacement | GovScope