Sunbeam Dam Stairs

SOL #: 1240LT26Q0006Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 8
Ogden, UT, 844012310, United States

Place of Performance

Stanley, ID

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
Mar 16, 2026
3
Submission Deadline
Mar 20, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for the Sunbeam Dam Stairs project, involving the removal and replacement of a large set of timber stairs at the Sunbeam Dam Interpretive Site within the Sawtooth National Recreation Area, Custer County, Idaho. This opportunity is a Total Small Business Set-Aside. Proposals are due by March 20, 2026, at 1600 MST.

Scope of Work

The project requires the removal of existing timber stairs and the construction of new treated timber stairs with handrails, including concrete landings and piers. The scope also covers surveying, placing crushed aggregate for trail connection, and site restoration. Special requirements include submitting an erosion control and stream protection plan, pressure-washing equipment before entering National Forest System lands to prevent noxious weeds, and ensuring an archeological monitor is present for specific ground-disturbing activities. Work occurring after August 15th requires confirmation regarding Chinook Salmon impact. The stair section will be closed during construction, but the interpretive site and restroom will remain open.

Contract Details

This is a Combined Synopsis/Solicitation issued as a Request for Quotation (RFQ), with the government intending to make one Firm-Fixed-Price purchase order award.

  • Period of Performance: July 7, 2026, to October 31, 2026 (100 calendar days from Notice to Proceed).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 238990 (Construction Of Other Non Building Facilities), with a small business size standard of $19.0M.

Submission & Evaluation

  • Proposals Due: March 20, 2026, by 1600 MST.
  • Submission Method: Electronically via email to Westley.Bisson@usda.gov.
  • Required Documents: Signed SF-18/SF-1449, a fully completed Schedule of Items with pricing for all items, and a completed Experience Questionnaire. Failure to provide these may result in a non-responsive quotation.
  • Evaluation: Proposals will be evaluated using a Lowest Price Technically Acceptable (LPTA) approach, considering price (fair and reasonable), technical acceptability, and past performance. Offerors must hold prices firm for 90 calendar days.
  • Questions: Questions were due by February 27, 2026, 1600 MST.

Key Attachments

Bidders should review the following critical documents:

  • J.3 Statement of Work Specs: Detailed project requirements and performance standards.
  • J.4 Maps Plans: Construction drawings, specifications, and design details.
  • J.1 Wage Determinations: Prevailing wage rates for Heavy Construction in Custer County, ID (ID20260047), essential for labor cost estimation.
  • J.2 Schedule of Items: The pricing sheet for developing cost proposals.
  • J.5 Experience Questionnaire: Required form for demonstrating contractor capability and past performance.

Contact Information

For inquiries, contact Westley Bisson at westley.bisson@usda.gov.

People

Points of Contact

Westley BissonPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Mar 16, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 9, 2026
View