SUPPLY,ELECTRIC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, is soliciting proposals for repair services for SUPPLY,ELECTRIC (NSN 15090 6309885). This solicitation, issued under an existing Basic Ordering Agreement (BOA) framework, requires a Repair Turnaround Time (RTAT) of 180 days and Government Source Inspection (GSI). Quotes are due by April 30, 2026.
Scope of Work
This opportunity covers the repair of SUPPLY,ELECTRIC items, ensuring they meet operational and functional requirements specified by Cage Code/Reference Number 15090 6309885. All repair work must adhere to the contractor's standard practices, manuals, and directives, including drawings, technical orders, and approved repair standards. Items must be marked in accordance with MIL-STD-130, REV N. The contractor is responsible for all inspection and testing requirements as per original manufacturer specifications and drawings. Packaging must comply with MIL-STD 2073.
Contract & Timeline
- Type: Solicitation (potentially resulting in a bilateral order under an existing BOA)
- Set-Aside: None specified
- Response Due: April 30, 2026, 4:30 PM Local Time (extended by Amendment 1)
- Published: April 13, 2026 (original solicitation published March 13, 2026)
- Place of Performance: Contractor's facility (for repair)
Key Requirements
Offerors must be authorized distributors of the original manufacturer's item. Quotes must include Unit Price, Total Price, and Repair Turnaround Time (RTAT). The Government requires an RTAT of 180 days, measured from asset return to acceptance. Failure to meet the required RTAT due to unexcusable contractor delay will incur a price reduction per unit per month. A Testing and Evaluation (T&E) fee will be negotiated for items determined to be Beyond Repair (BR). Freight is FOB Origin, with the Navy handling freight per the Commercial Asset Visibility (CAV) Statement of Work.
Additional Notes
This solicitation incorporates terms and conditions from existing BOAs. Offerors should verify nomenclature, part number, and NSN before responding. Contact AMY.S.REYNOLDS3.CIV@US.NAVY.MIL for inquiries.