SUPPORT,BEARING,AIR

SOL #: SPRTA126Q0292Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA AVIATION AT OKLAHOMA CITY, OK
TINKER AFB, OK, 73145-3070, United States

Place of Performance

S Coffeyville, OK

NAICS

Aircraft Engine and Engine Parts Manufacturing (336412)

PSC

Gas Turbines And Jet Engines, Aircraft, Prime Moving; And Components (2840)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 23, 2026
2
Last Updated
Apr 23, 2026
3
Submission Deadline
May 22, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Aviation at Oklahoma City, OK has issued a Request for Quotation (RFQ) for SUPPORT, BEARING, AIR (NSN: 2840-00-326-6018 NZ, PN: 4034245). This procurement is for new manufactured materials, identified as a Critical Safety Item, and requires First Article Testing. Quotations are due by May 22, 2026.

Scope of Work

  • Primary Deliverable: SUPPORT, BEARING, AIR (NSN: 2840-00-326-6018 NZ).
  • First Article Testing (Bid A): Mandatory, unless waived, including destructive and non-destructive exhibits.
  • Production Articles (Bid B): No First Article testing required for this bid.
  • Qualification: Offerors must be approved sources in accordance with the Qualification Requirements clause.

Contract & Timeline

  • Type: Firm Fixed Price (FFP).
  • Set-Aside: Not a small business set-aside.
  • Response Due: May 22, 2026, by close of business.
  • Published: April 23, 2026.
  • Price Firmness: Offerors' prices must be held firm for 120 days.

Evaluation

Evaluation will prioritize Technical Capability, followed by Price/Cost, and then Past Performance. Technical acceptability is a prerequisite for best value analysis. Tradeoffs may occur between price and past performance for technically acceptable proposals.

Additional Notes

  • Source Approval Requests (SARs): Encouraged to be submitted promptly; award will not be delayed for pending SAR reviews.
  • Engineering Data: Engineering Data List (EDL) and drawings are available via a secure link on www.sam.gov.
  • Export Control: Export-controlled data is accessible via a secure link on SAM.gov.

People

Points of Contact

Aric HarmonPRIMARY
James HeadingtonSECONDARY

Files

Files

Download

Versions

Version 2Viewing
Solicitation
Posted: Apr 23, 2026
Version 1
Pre-Solicitation
Posted: Apr 23, 2026
View
SUPPORT,BEARING,AIR | GovScope