SWITCHING GROUP,DIG
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support, has issued a Solicitation for the competitive repair of SWITCHING GROUP,DIG (NSN 5895016717370). This opportunity requires interested parties to be a NAVSUP WSS approved source for the supply item. The evaluation will be based on Lowest Price Technically Acceptable (LPTA), and vendors are requested to submit a Firm-Fixed Price (FFP) quote/proposal. The solicitation closing date has been extended to July 30, 2026.
Scope of Work
This requirement involves the repair, overhaul, testing, and inspection of the specified digital switching group to return units to a Ready For Issue (RFI) condition. Key aspects include:
- Repair/Overhaul: Disassembly, cleaning, inspection, repair/replacement of components, reassembly, and testing in accordance with approved manuals.
- Quality Standards: Contractors must maintain a quality control system meeting Mil-I-45208A, Mil-Q 9858, ISO-9000/9001/9002, or equivalent, and an ISO 9001/SAE AS9100 compliant quality system.
- Technical Requirements: Markings per MIL-STD-130, use of SAE-AS22759 series wire, and compliance with IPC/EIAJ-STD-001C for personnel.
- Repair Turnaround Time (RTAT): Required RTAT is 110 days after receipt of asset. Contractors must provide a monthly throughput constraint.
- Material & Parts: Contractor is responsible for supplying all parts and materials, which must be new per FAR 52.211-5. Cannibalization requires specific PCO approval.
- Special Conditions: Procedures for Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) are detailed, requiring DCMA concurrence and PCO approval.
Contract & Timeline
- Type: Solicitation for competitive repair, Firm-Fixed Price (FFP).
- Set-Aside: None specified.
- Response Due: July 30, 2026, 8:30 PM EDT.
- Published: June 15, 2026.
- Induction Expiration Date: 365 days after contract award date.
Evaluation
Award will be made to the offeror providing the Lowest Price Technically Acceptable (LPTA) proposal. Offerors must be a NAVSUP WSS approved source for the item.
Additional Notes
Contractors must specify the name and location of the repair source. All contractual documents are considered issued when deposited in mail, transmitted by facsimile, or sent by other electronic commerce methods. Early and incremental deliveries are accepted.