SWITCHING MODULE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Mechanicsburg has issued a Solicitation for the manufacture and supply of a SWITCHING MODULE. This is identified as a US Navy high-priority requirement (CASREP), critical for addressing the breakdown of mission-essential equipment, demanding the absolute best delivery. Award will be based on Lowest Price Technically Acceptable (LPTA) criteria. Responses are due by March 30, 2026.
Scope of Work
This opportunity requires the manufacture of a SWITCHING MODULE conforming to specific Cage Code/reference numbers (e.g., 12763, 60178-935-01/02). Items must be marked in accordance with MIL-STD-130, REV N. Contractors are responsible for all inspection requirements, maintaining records for 365 days post-delivery, and packaging according to MIL-STD 2073.
Key Requirements & Instructions
- No drawings or technical data are available for this item.
- Offerors who are not the manufacturer MUST state the Original Equipment Manufacturer (OEM) and its Commercial and Government Entity (CAGE) code and part number.
- Consideration for award will only be given to authorized distributors of the original manufacturer's item; proof on company letterhead is required with the offer.
- Any changes in design, material, servicing, or part number require prior approval from the NAVICP-MECH Contracting Officer.
- Electronic submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF is mandatory.
- Production facility changes require Contracting Officer approval and a $250 price reduction for administrative costs.
Contract & Timeline
- Opportunity Type: Solicitation
- Set-Aside: None specified
- Evaluation: Lowest Price Technically Acceptable (LPTA) per DFARS 215.101-2-70(a)(1)(i).
- Response Due: March 30, 2026, 8:30 PM UTC
- Published: March 16, 2026, 8:50 AM UTC
Contact Information
For inquiries, contact TYLER.HOLMES@DLA.MIL.