Synopsis: Multiple FSCs supporting various weapon systems, Competitive Strategic Contract – Aircraft Structural Components Project – Option Add Group
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
This Synopsis is related to Request for Information - Aircraft Structures Project SPE4AX20RASCP and Solicitation SPE4A2-21-R-0003. After the Synopsis period, issuance of a Letter Solicitation is anticipated.
The Defense Logistics Agency (DLA) Aviation seeks to add these items to the following contracts in accordance with the originally approved J&A for the following contracts:
SPE4A2-22-D-0005 awarded to H M Dunn Company, CAGE 64666
SPE4A2-22-D-0007 awarded to Aero-Glen International LLC, CAGE 9V172
SPE4A2-22-D-0008 awarded to S&K Logistics Services LLC, CAGE 6DXD0
SPE4A2-22-D-0009 awarded to Kit Pack Co. Inc, CAGE 30842
SPE4A2-22-D-0010 awarded to A J Associates Manufacturing & Engineering Co Inc, CAGE 3Z260
SPE4A2-22-D-0011 awarded to Aeroforce Logistics LLC, CAGE 7K6J5
SPE4A2-22-D-0013 awarded to Precision Air Inc, CAGE 6E451
SPE4A2-22-D-0014 awarded to GSE Dynamics Inc, CAGE 29183
SPE4A2-22-D-0015 awarded to Boneal Inc, CAGE 5X802
SPE4A2-22-D-0016 awarded to Camnetics Manufacturing Group, CAGE 0P657
SPE4A2-22-D-0018 awarded to Aero Components LLC, CAGE 59213
However, the NSNs identified here were not included in the list of original items synopsized for this effort. The LTCs have seven years remaining. The contract requires supply of parts for FSC 1560, 1660, and 1680 as well as other functions including but not limited to inventory management, forecasting, distribution, storage, reliability improvements, engineering maintenance, and design control affecting these parts. These items have been identified as competitive.
NOTE: Attached list of NSNs