TAMPA HARBOR, DREDGE MATERIAL MANAGEMENT AREA 3-D SITE IMPROVEMENTS AND MAINTENANCE, HILLSBOROUGH COUNTY, FLORIDA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The project consists of the construction of two new weir structures in the DMMA 3-D basin. The weir construction also includes associated concrete foundation, discharge pipes, filter drain and CLSM, helical anchors, mitered end sections, riprap outfall area, floating platform, gangway, and flap gate. Associated earthwork includes deconstruction of the existing dike in the vicinity of the new weirs; reconstruction of the dike; and construction of new earthwork features including ramps. The project also entails repair and stabilization of eroded sections of the existing exterior dike slope, including placement of fill, riprap, and sod. The gangway at the existing weirs is damaged and requires removal and replacement. The floating dock at the existing weirs requires modification to allow for proper operation (See Appendix A: Shop Drawings of Existing Weirs). Concrete repairs are also required at the existing weirs.