Tampa Harbor, Maintenance Dredging, Upper Channels and Cut-G (PT), Hillsborough County, Florida

SOL #: W912EP25CA009JustificationSole Source

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W074 ENDIST JACKSNVLLE
JACKSONVILLE, FL, 32207-0019, United States

Place of Performance

Tampa, FL

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Maintenance Of Dredging Facilities (Z1KF)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 10, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE) Jacksonville District has issued a Justification and Approval (J&A) for a sole-source modification to an existing Firm-Fixed-Price (FFP) contract (W912EP25CA009) for Maintenance Dredging in Tampa Harbor, Florida. This modification, valued at an estimated $2M, is critical to address severe shoaling that has caused a 37-foot draft restriction, impacting regional supply chains and vessel traffic.

Purpose & Scope

The J&A justifies the urgent need to add additional dredge areas within Tampa Bay Cuts A, B, C, D, and E. The primary goal is to restore these channels to a required depth of 44 feet with a 1-foot allowable overdepth, involving the dredging of approximately 40,000 cubic yards of material. Dredged material will be disposed of in the existing Dredged Material Management Area (DMMA) 2D. The project also requires continued turbidity and environmental species monitoring.

Contract Details

  • Type: Modification to an existing Firm-Fixed-Price (FFP) contract.
  • Estimated Value: $2,000,000
  • Funding: Operation and Maintenance funds.
  • Contractor: Incumbent contractor (Cashman) utilizing existing crew and equipment.
  • Timeline: Work must commence within 30 days and be completed before the contractor returns to the remaining sections of the original scope.
  • Published Date: April 10, 2026

Justification for Sole Source

This modification is justified under 10 U.S.C. 3204(a)(1) and FAR 6.103-1(c)(2)(ii), citing only one responsible source can satisfy the agency's requirements without unacceptable delays. The incumbent contractor is already mobilized on-site with specialized equipment and personnel. A full and open competition would cause several months of delay, exacerbating economic harm to the Port of Tampa, which is projected to lose up to 400 vessel calls in 2026 due to the draft restriction. This approach also avoids duplicating mobilization/demobilization costs.

Eligibility / Set-Aside

The original solicitation (W912EP25CA009) required and met a Small Business Participation Plan and subcontracting plan. This specific modification is a one-time, urgent requirement being executed on a sole-source basis. Future maintenance dredging requirements will be procured through full and open competition.

Key Information

People

Points of Contact

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: Apr 10, 2026
Tampa Harbor, Maintenance Dredging, Upper Channels and Cut-G (PT), Hillsborough County, Florida | GovScope