TBRD Water Leak Repair Phase 2

SOL #: 127EAX26Q0045Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 7
Albuquerque, NM, 871023498, United States

Place of Performance

Roosevelt, AZ

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 13, 2026
2
Submission Deadline
Jun 19, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service, Tonto National Forest is soliciting quotations for TBRD Water Leak Repair Phase 2 in Roosevelt, AZ. This Total Small Business Set-Aside opportunity aims to eliminate known water network leaks, improve efficiency, and provide for future repairs. The project requires contractors to furnish all labor, materials, and equipment. Proposals are due June 19th, 2026.

Scope of Work

The project involves repairing leaks in the drinking water network across various campgrounds within the Tonto Basin Ranger District, including Cholla, Windy Hill, Grapevine, and Burnt Corral. The Base Bid includes specific repairs such as relocating hydrants at Teddy Bear and Christmas Loops, repairing leaks under pavement at Chipmunk and Grapevine Goose Loops (including asphalt repair), water line leak repair and pipe replacement at Burnt Corral Campground, and installing priority and reduction valves at Grapevine Group Campground and Cholla Campground.

Optional Line Items: The contract includes optional line items for future repairs over a one-year period, covering additional hydrant relocations, leak repairs (under/outside pavement), valve installations, and water pipe replacements.

Deliverables: The contractor must provide as-built drawings of the project upon completion.

Contract Details

  • Type: Firm Fixed Price Contract (RFQ)
  • Set-Aside: Total Small Business Set-Aside (NAICS 238220, $19M size standard)
  • Period of Performance: Base period from June 29, 2026, to June 28, 2027. Work is to commence within 10 calendar days after Notice to Proceed (NTP), with base line-item work ready for use not later than 60 calendar days after NTP.
  • Performance Bonds: Mandatory, due within 10 calendar days after award.
  • Wage Requirements: Davis-Bacon wages apply (refer to Attachment 6).

Submission & Evaluation

  • Organized Site Visit: May 26th, 2026, at 10:00 AM Local time, meeting at 28079 AZ-188, Roosevelt, AZ 85545.
  • Questions Due: June 12th, 2026, 1:00 PM Central Daylight Time, via email to troy.mccullough@usda.gov.
  • Proposals Due: June 19th, 2026, 1:00 PM Central Daylight Time, via email to troy.mccullough@usda.gov.
  • Required Documents: SF1442, Attachment 5 (Schedule of Items with pricing), Technical Proposal (Work Plan/Capability, Key Personnel, Performance Schedule), and Bid Guarantee.
  • Evaluation Criteria: Award will be made to the offeror with the highest technically rated proposal with fair and reasonable pricing and acceptable or neutral past performance. Tradeoffs will not be conducted.

Special Requirements

Bidders must adhere to the "INDUSTRIAL FIRE PRECAUTIONS PLAN GUIDELINES" (Attachment 2) for operations on Tonto National Forest Lands. An OSHA 30-HR certified safety inspector, a dedicated site superintendent, and a quality control representative are required. Contractors must verify pipe sizing and material and coordinate with Arizona 811 before working near underground utilities.

People

Points of Contact

Troy McCulloughPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 13, 2026
TBRD Water Leak Repair Phase 2 | GovScope