TCE-HR Lodging and Transportation

SOL #: N3220526R6021Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
MSCHQ NORFOLK
NORFOLK, VA, 23511-2313, United States

Place of Performance

Fort Eustis, VA

NAICS

Hotels (except Casino Hotels) and Motels (721110)

PSC

Lodging Hotel/Motel (V231)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Nov 20, 2025
2
Last Updated
Mar 16, 2026
3
Submission Deadline
Feb 27, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

Amendment 001 to this Solicitation from the Department of the Navy, specifically Military Sealift Command (MSC) in Fort Eustis, VA, is seeking proposals for lodging and transportation services for authorized Civil Service Mariners (CIVMARs). This Total Small Business Set-Aside opportunity requires facilities within a 25-mile radius of Training Center East-Hampton Roads (TCE-HR), excluding locations separated by a tunnel. Proposals are due by February 27, 2026, at 3:00 PM EST.

Scope of Work

The contractor shall provide comprehensive lodging and daily round-trip transportation services for an estimated 50-95 CIVMARs per night and 30-50 CIVMARs daily for transportation. Services include furnishing necessary facilities, equipment, and supplies. The commute time from lodging to MSC TCE-HR must not exceed one hour each way during peak traffic.

Key Requirements

  • Lodging: Hotels must be AAA Three Diamond rated or higher, listed on the current Hotel-Motel Master List, and located within a 25-mile driving radius of TCE-HR (Fort Eustis, VA 23604), excluding tunnel-separated locations. Each room must include a microwave and refrigerator. Facilities require functional internet, on-site laundry (2 washers/2 dryers, more if providing >50% of rooms), and a business center with at least two computers and printers. Dining facilities must be available on-site or within a half-mile. Hotels must not be under renovation during the performance period.
  • Transportation: Daily round-trip transportation is required between the hotel and MSC TCE-HR (Buildings 667 and 827). Vehicles must be climate-controlled, and drivers/vehicles must meet state and base requirements. DBIDS passes must be obtained within two weeks of contract award.
  • Safety & Security: Security cameras are required at entry/exit points and lobby areas, with emergency battery lighting in common areas.
  • Documentation: CIVMARs must present a valid US Government Common Access Card (CAC) for transportation and identity verification (photo ID, Merchant Mariner Credential, CAC) upon check-in.

Contract Details

  • Type: Firm Fixed Price.
  • Period of Performance: A five-year ordering period from October 1, 2026, to September 30, 2031, with an option for an additional period from October 1, 2031, to March 31, 2032.
  • Estimated Value: Minimum $609.35, Maximum $3,494,581.25 for the entire five-year ordering period.
  • Estimated Volume: Approximately 34,675 single room nights and 1,750 single transportation trips per year.

Submission & Evaluation

  • Submission: Proposals must be submitted electronically via PIEE in two volumes: Volume I (Price and Solicitation Documents) and Volume II (Technical Capability).
  • Evaluation: Offers will be evaluated using a Lowest Price Technically Acceptable (LPTA) approach. Technical capability will be assessed as "acceptable" or "unacceptable" across five subfactors: General Requirements of Hotel Facilities, Fire and Safety Policies, Health and Sanitation, Transportation, and On-Site Inspection. An onsite checklist (Attachment B) details specific inspection criteria.
  • Questions: A template for submitting questions is provided, indicating vendors are expected to submit questions in this format.

Deadlines

  • Proposal Due Date: February 27, 2026, at 3:00 PM EST.

Contact Information

People

Points of Contact

Alvinia R. JenkinsSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 15
Solicitation
Posted: Mar 16, 2026
View
Version 14
Solicitation
Posted: Mar 16, 2026
View
Version 13
Solicitation
Posted: Mar 12, 2026
View
Version 12
Solicitation
Posted: Mar 12, 2026
View
Version 11
Solicitation
Posted: Mar 10, 2026
View
Version 10
Solicitation
Posted: Mar 6, 2026
View
Version 9
Solicitation
Posted: Mar 3, 2026
View
Version 8
Solicitation
Posted: Mar 3, 2026
View
Version 7
Solicitation
Posted: Mar 2, 2026
View
Version 6
Solicitation
Posted: Feb 25, 2026
View
Version 5
Solicitation
Posted: Feb 19, 2026
View
Version 4
Solicitation
Posted: Feb 18, 2026
View
Version 3Viewing
Solicitation
Posted: Feb 9, 2026
Version 2
Solicitation
Posted: Feb 2, 2026
View
Version 1
Solicitation
Posted: Nov 20, 2025
View
TCE-HR Lodging and Transportation | GovScope