TDA Auxiliary Water Supply Backup Debris Management

SOL #: W9127N26BA019Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W071 ENDIST PORTLAND
PORTLAND, OR, 97204-3495, United States

Place of Performance

Lyle, WA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Other Conservation And Development Facilities (Z2KZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 12, 2026
2
Response Deadline
Jun 28, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE) Portland District (NWP) intends to solicit bids for Auxiliary Water Supply Backup Debris Management at The Dalles Lock and Dam (TDA). This Design-Bid-Build construction project will implement a mechanical system to clear debris from trashracks. This opportunity is a 100% Small Business Set-Aside. The solicitation is anticipated for late June/early July 2026, with an award in September 2026.

Project Background & Scope

This project addresses the need for a predesigned mechanical method to dislodge debris from the trashracks at the East Fish Ladder (EFL) Auxiliary Water Supply Backup (AWSB) system intake at The Dalles Lock and Dam in Oregon. The current method requires shutting down the AWSB system for manual clearing. The scope includes:

  • Predesigned AWSB Intake Trashrack Cleaning System: Based on a telescoping boom-mounted rotating bristle brush (trashrake).
  • Infrastructure: Pavement repairs, trenching for power/controls, fixed upper and lower operator/mechanic platforms (structural steel, epoxy anchored).
  • Electrical & Controls: Power from MCC FCQ7, routed to the AWSB intake. Vendor-supplied control system with operator-initiated cycles, integrated with the East Exit Fish SCADA PLC for monitoring.

Contract & Timeline

  • Type: Firm Fixed-Price (Design-Bid-Build)
  • Estimated Cost: $1,000,000.00 to $5,000,000.00
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Anticipated Advertisement: Late June/early July 2026
  • Anticipated Award: September 2026
  • Estimated Construction Completion: End of calendar year 2028
  • Place of Performance: Lyle, WA

Source Selection & Requirements

  • Method: Invitation for Bid (IFB)
  • CMMC Level: CMMC Level 2 (Self) required prior to award and maintained throughout the contract.
  • Registration: Offerors must be registered in SAM.gov.

Additional Notes

This is a PRESOLICITATION NOTICE to inform industry of the upcoming opportunity. It is not an invitation for bids, and any bids received now will not be accepted or evaluated. The government reserves the right to cancel this solicitation.

People

Points of Contact

Justin FigueredoSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Pre-Solicitation
Posted: Jun 12, 2026
TDA Auxiliary Water Supply Backup Debris Management | GovScope