TEARDOWN, EVALUATE, REPAIR AND MODIFY POWER SUPPLY
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, is seeking quotes for the teardown, evaluation, repair, and modification of POWER SUPPLY, NSN 7HH 6130-01-520-5554 (Product Service Code 6130). This is a Solicitation (RFQ) for repair services, with a target Repair Turnaround Time (RTAT) of 60 days. Quotes are due by close of business on April 13, 2026.
Scope of Work
This opportunity requires contractors to perform teardown, evaluation, repair, and/or modification services for the specified POWER SUPPLY. All repair work must adhere to the contractor's repair/overhaul standard practices, manuals, and directives, including relevant drawings and technical orders. Key requirements include:
- Marking: Physical identification in accordance with MIL-STD-130.
- Packaging: In accordance with MIL-STD-2073.
- Unique Item Identification (UII): Required for delivered items with a Government unit acquisition cost of $5,000 or more, or as otherwise specified.
- Government Source Inspection (GSI): Required.
- Commercial Asset Visibility (CAV) RP Reporting: Required.
Contract Details
The resultant award will be a repair contract, issued bilaterally, with delivery required within 60 days from the date of the order. Freight terms are FOB Origin, with the Navy handling freight as per the Commercial Asset Visibility (CAV) Statement of Work. An option quantity may be added to the resultant contract. Price reduction penalties will apply for failure to meet the required RTAT due to unexcused contractor delay.
Submission & Evaluation
Quotes must be submitted by close of business on April 13, 2026. Submissions must include the quote amount and proposed Repair Turnaround Time (RTAT). If the required RTAT cannot be met, capacity constraints must be provided. The government intends to make a single award to the eligible, responsible, technically acceptable offeror whose offer is most advantageous. Past performance will be considered more important than price in the evaluation.
Eligibility & Notes
No specific set-aside is indicated for this opportunity. Offerors should verify nomenclature, part number, and NSN prior to responding. The primary contact for this opportunity is JACOB.T.DAVIS18.CIV@US.NAVY.MIL.