Temporary Wastewater Treatment Plant and Operation and Maintenance Services
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Description: The USACE Chicago District has a forthcoming requirement for a mobile Wastewater Treatment Plant (WWTP) for treatment of contaminated pond water at a Confined Disposal Facility (CDF) and discharge the treated wastewater meeting the State of Indiana NPDES permit requirements, into Lake George Branch of the Indiana Harbor Canal (IHC). The requirement includes operatation and maintainance of the WWTP, and pumping and treating up to 15M gallons of wastewater a month, when ordered.
This requirement is planned to be a total small business set-aside. The contract type is planned to be a five-year, single awared task order contract (SATOC).