Test Facility Pump System
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Air Force Test Center’s Installation Contracting Division (AFTC/PZI) at Arnold Air Force Base (AFB), Tennessee, is conducting a Sources Sought to identify capable firms for a new test facility pump system. This effort involves the design, installation, and verification of a complete cooling water system. Responses are due February 10, 2026.
Scope of Work
The Government requires comprehensive services for a new cooling water system at a test facility located at Arnold AFB, Tennessee. This includes:
- Design and analysis
- Procurement of necessary components
- Documentation
- Fabrication
- Installation
- Verification activities The system must include connections to the existing cooling water supply and piping.
Contract & Timeline
- Type: Sources Sought / Market Research
- NAICS: 333996 Fluid Power Pump and Motor Manufacturing
- Size Standard: 1,250 employees
- Set-Aside: None specified
- Response Due: February 10, 2026, 2:00 PM Central Time
- Published: January 26, 2026
Submission Requirements
Interested sources should provide:
- Company name, address, telephone number, and email for point of contact.
- System for Award Management (SAM) Unique Entity Identifier (UEI) Number.
- Overview of the company’s technical capabilities, specifying if the company is a manufacturer, distributor, or general contractor.
Additional Notes
This is for informational purposes only and does not constitute a solicitation. Draft requirement documents marked Distribution Statement D are available upon request. The Contracting Officer may schedule follow-up discussions with companies whose technical capabilities align with the requirement.