Test Facility Pump System Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The United States Air Force (USAF), through AEDC, is seeking proposals for a Test Facility Pump System Replacement at Arnold Air Force Base, TN. This opportunity involves the design and demonstration of an operational utility prototype for a raw water supply system, including new pumps, supporting infrastructure, and a new free-standing building. This is an Other Transaction for Prototype (OTP) agreement. Proposals are due May 11, 2026.
Purpose & Scope
The primary objective is to replace an aging raw water supply system with a more reliable and flexible solution. The scope of work includes:
- Design, procurement, and installation of a new six-pump raw water system (five replacements and one redundant).
- Design and construction of a new free-standing building to house the system.
- Integration of the new system and building with existing site infrastructure, minimizing operational downtime.
- Design activities encompass Requirements Review (RR), 30% Preliminary Design Review (PDR), Long-Lead Procurement Review, 90% Critical Design Review (CDR), and 100% Final Design Submission and Approval.
- The contractor is responsible for the final engineering design and drawings.
Contract Details
- Type: Other Transaction for Prototype (OTP) under 10 U.S.C. § 4022.
- Set-Aside: None specified. Eligibility criteria include participation of non-traditional defense contractors, small businesses, or non-Federal funding.
- Place of Performance: Arnold Air Force Base, TN.
- Response Due: May 11, 2026, 7:00 PM ET.
- Published: April 22, 2026.
- Contact: Haley Smith (haley.smith.10@us.af.mil).
Key Requirements
- Compliance with specific building requirements (Appendix G) for civil, architectural, mechanical, electrical, and lightning protection.
- Adherence to AEDC Standards (Appendix C) for engineering, safety, health, and environmental practices.
- Bridge crane specifications (Appendix I) for a 20-ton main hook and 5-ton auxiliary hook.
- The Government shall receive Unlimited Government Use Data Rights for all technical data, drawings, software, and reports produced.
Eligibility & Evaluation
- Offerors must provide documentation satisfying 10 U.S.C. 4022(d)(1)(A)-(C) criteria.
- Active Joint Certification Program (JCP) certification is required.
- Compliance with NIST SP 800-171 DoD Assessment Requirements (current assessment within three years, summary-level score of 110 or higher, or a Plan of Action). CMMC Level 2 certification is required per the amended agreement articles.
- Proposals will be evaluated on three factors: Corporate Experience, Technical Proposal (Execution Plan, Technical Approach, Prototype Schedule, Data Rights), and Price. Price is secondary to the technical approach.
- Payable milestones are defined for the prototype award.
Important Notes
Some attachments are marked Distribution D; contact the Agreements Officer for access to these protected documents.