Tinian Well Rehab Pump Install
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals for the Tinian Well Rehab Pump Install project, a Firm Fixed-Price contract to install submersible water well pumps at the Ushi and M-10 wells in Tinian North Field, CNMI. This effort aims to establish a reliable and sustainable water supply for non-potable applications. This acquisition is a Total Small Business Set-Aside. Offers are due February 18, 2026, at 03:30 PM.
Scope of Work
The project involves the installation of new, BAA-compliant submersible water well pumps at two locations: the Ushi and M-10 wells on Tinian North Field, Commonwealth of the Northern Mariana Islands (CNMI). The primary purpose is to provide a consistent water supply for non-potable uses such as dust suppression, soil conditioning, and general field operations. The target flow rate for the pump system is approximately 50,000 Gallons Per Day (GPD), or about 35 Gallons Per Minute (GPM).
Key Clarifications
Responses to vendor questions clarify several project aspects:
- Period of Performance (PoP): The 60-day PoP is specifically for on-site construction and commissioning, commencing with the Notice to Proceed (NTP). Bidders should account for potential long lead times for BAA-compliant materials in their overall schedule, separate from the on-site PoP.
- Permanent Power Connection: The Government will supply a 460V/3-Phase power source within 100 feet of each wellhead. The contractor is responsible for all subsequent electrical work, including trenching, conduit, wiring, and final connections to their equipment.
- Pump Specification: The requirement is for a new, BAA-compliant pump system meeting performance needs, with no specific brand mandated.
Contract Details & Timeline
- Contract Type: Firm Fixed Price
- Period of Performance: 60 Calendar Days from the Date of Award (for on-site work)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 333914 (Pump and Pumping Equipment Manufacturing)
- Size Standard: 750 employees
- Offer Due Date: February 18, 2026, at 03:30 PM
- Solicitation Issue Date: February 3, 2026
- Published Date: February 4, 2026
Evaluation Factors
Award will be made to the responsible offeror whose proposal is most advantageous to the Government, considering both Technical capabilities and Price.