TINKER AFB MAC BOA WWYK090020; WWYK090032 AND WWYK240001 - ROOFS B1049 AND B7038; B414; B6601

SOL #: FA813726R0018Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Roofing Contractors (238160)

PSC

Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 8, 2026
2
Last Updated
Apr 30, 2026
3
Submission Deadline
May 29, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals from Tinker AFB MAC BOA Holders ONLY for multiple roof replacement and repair projects across four buildings (B1049, B7038, B414, B6601) at Tinker Air Force Base, Oklahoma. This opportunity is a Total Small Business Set-Aside with an estimated value between $1,000,000 and $5,000,000. Proposals are due May 29, 2026.

Scope of Work

This contract encompasses three distinct projects:

  • WWYK090020: Replacement of the trapezoidal metal roof system on Building 1049 and installation of a two-component silicone coating system on Building 7038.
  • WWYK090032: Repair and replacement of the roof on Building 414 with a new full adhered EPDM membrane system.
  • WWYK240001: Replacement of the roof on Building 6601, involving new metal panels and EPDM membrane, including related mechanical, plumbing, and electrical work.

All projects require limited design services, materials, labor, and equipment, with specific performance standards for materials, wind resistance, and warranties (30-year manufacturer, 2-year installer).

Contract Details

  • Contract Type: Firm Fixed Price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5), restricted to SB MAC BOA holders who attended the mandatory site visit.
  • Estimated Value: $1,000,000 - $5,000,000
  • Period of Performance: Varies by project: 215 days (WWYK090020), 200 days (WWYK090032), and 150 days (WWYK240001) after Notice to Proceed (NTP).
  • Place of Performance: Tinker Air Force Base, S Coffeyville, OK.

Key Dates

  • Mandatory Site Visit: April 14, 2026 (required for eligibility).
  • RFIs Due: April 21, 2026.
  • Proposals Due: May 29, 2026, at 2:00 PM local time.
  • Offer Acceptance Period: 120 calendar days.

Evaluation & Submission

  • Method: Lowest Priced Technically Acceptable (LPTA) Source Selection procedures.
  • Factors: Technical acceptability (Capability & Management, Schedule & Planning) and Price. Technical proposals must demonstrate an on-site management team, subcontractor management, warranty support, and a realistic construction schedule.
  • Requirements: Electronic proposal submission (MS Office, text-searchable PDF), a bid guarantee (minimum 20% of proposal), and compliance with all Order Proposal Request (OPR) terms. Section L (Instructions to Offerors) takes precedence over Basic Ordering Agreement (BOA) terms.

Important Notes

  • Funds are contingent upon appropriation.
  • Performance and Payment Bonds are required.
  • Contractor personnel require specific certifications, base access (Entry Access List - EAL), and Foreign Object Debris (FOD) training. As-Built drawings and wage determinations are provided for reference.

People

Points of Contact

Eric OwensPRIMARY
Stephen PalmerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: Apr 30, 2026
View
Version 3Viewing
Solicitation
Posted: Apr 20, 2026
Version 2
Solicitation
Posted: Apr 17, 2026
View
Version 1
Solicitation
Posted: Apr 8, 2026
View