TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280

SOL #: FA813725R0035Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

Tinker AFB, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Restoration Of Real Property (Public Or Private) (Z2QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 2, 2025
2
Last Updated
Nov 13, 2025
3
Submission Deadline
Sep 2, 2025, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.

Updated 13 August 2025

Revised Drawings, Submittal Register, and Deisgn Analysis in response to RFI #22 have been attached.

Solicitation Amendment with the extension of proposal dates is attached.

Proposal due dates are extended from 15 August 2025 to 02 September 2025.

Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.

Updated 7 August, 2025.

The following is the DOR response to RFI #7: 

"The LED Text Sign needs to meet both UFC requirements and Tinker AFB

Standards and have a second line that can scroll message from left to right. The

proposed text sign attached to this RFI will not meet the Tinker AFB Standards. The

LED Text Sign is not required to be Monaco, but will need to meet both UFC and

Tinker AFB Standards.

If the LED Text Sign installed does not meet the required classification, the

enclosure for the LED Text Sign will need to be listed or approved for installation

within a Class 1/Division 1 area. The proposed enclosure does not meet Class

1/Division 1 and the use of a purging/pressurization system to achieve the

classification is not approved. The installation is concerned about using any

enclosure that would drive additional maintenance requirements."

Proposal due dates are still 15 August, 2025. 

Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.

Updated 06 August, 2025

Solicitation Amendment with the extension of proposal dates is attached.

Proposal due dates are extended from 08 August, 2025 to 15 August, 2025

Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.

Updated 30 July, 2025

Solicitation Amendment with the extension of proposal dates is attached.

Proposal due dates are extended from 31 July, 2025 to 08 August, 2025.

Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.

Updated 21 July 2025

RFI Responses and 8 new attachments are hereby provided.

Proposals are still due by 31 July, 2025 at 1200 PM CST.

Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.

Updated 15 July 2025

Solicitation Amendment with the extension of proposal dates is attached.

Proposal due dates are extended from 17 July, 2025 to 31 July, 2025.

Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.

Updated 15 July 2025

A solicitation amendment will be posted shortly that will extend the proposal due date while we are awaiting for RFI Responses.

Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.

Updated 23 June 2025

The Solicitation, Site Visit Sign In Sheet and all of the Specs Documents have been attached.

Proposals are still due 17 July, 2025.

This posting is for Tinker AFB - MAC BOA Holders ONLY.  

Updated 13 June 2025.

The initial site visit held on 12 June 2025 was not conducted.

***** Inititial Site Visit is Rescheduled for 23 June 2025 starting at 9:30 through 10:30, meet at main entrance for B2280.

***** You must attend the Initial Site Visit for the project to be considered eligible to propose.

Even if you sent an RSVP for the first initial site visit, request that you send another RSVP and EAL if required, by NOON on 18 June 2025 so that we will know who will be in attendance.

You must attend the Initial Site Visit for the project to be considered eligible to propose.

An RFP amendment will be sent out after the initial site visit to address a revised proposal due date.

This posting is for Tinker AFB - MAC BOA Holders ONLY.  

Updated June 11, 2025.

Corrected Proposal Due Dates from June 27, 2025 to July 17, 2025. 

This posting is for Tinker AFB - MAC BOA Holders ONLY.  

Project Solicitation Number:  FA813725R0035

Project Title: WWYK190068 – REPAIR FIRE SUPPRESSION SYSTEM, B2280
Project Location: Tinker AFB - B2280 
Repair the fire suppression system at project location within B2280 at Tinker Air Force Base (AFB) Oklahoma 73145

Project specific documents are attached to this posting.

If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission.  In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to.  Do not include any Sub-Contractor email addresses.

Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.

This posting is for Tinker AFB - MAC BOA Holders ONLY.  

After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.  Your RSVP email must be received within 5 calendar days from the posting of this project.  In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access.  If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access

After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated, and the Initial Site Visit is set for Thursday, June 12th at 10:30 A.M. CST on Tinker AFB, B2280.

You must attend the Initial Site Visit for the project to be considered eligible to propose.

This posting is for Tinker AFB - MAC BOA Holders ONLY.  

People

Points of Contact

Damian ElfordSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 24
Solicitation
Posted: Nov 13, 2025
View
Version 23
Solicitation
Posted: Nov 5, 2025
View
Version 22
Solicitation
Posted: Oct 24, 2025
View
Version 21
Solicitation
Posted: Oct 7, 2025
View
Version 20
Solicitation
Posted: Oct 3, 2025
View
Version 19
Solicitation
Posted: Sep 25, 2025
View
Version 18
Solicitation
Posted: Sep 18, 2025
View
Version 17
Solicitation
Posted: Sep 18, 2025
View
Version 16
Solicitation
Posted: Sep 18, 2025
View
Version 15
Solicitation
Posted: Sep 17, 2025
View
Version 14
Solicitation
Posted: Sep 16, 2025
View
Version 13
Solicitation
Posted: Aug 28, 2025
View
Version 12
Solicitation
Posted: Aug 14, 2025
View
Version 11Viewing
Solicitation
Posted: Aug 13, 2025
Version 10
Solicitation
Posted: Aug 7, 2025
View
Version 9
Solicitation
Posted: Aug 6, 2025
View
Version 8
Solicitation
Posted: Jul 30, 2025
View
Version 7
Solicitation
Posted: Jul 21, 2025
View
Version 6
Solicitation
Posted: Jul 15, 2025
View
Version 5
Solicitation
Posted: Jul 15, 2025
View
Version 4
Solicitation
Posted: Jun 23, 2025
View
Version 3
Solicitation
Posted: Jun 13, 2025
View
Version 2
Solicitation
Posted: Jun 11, 2025
View
Version 1
Solicitation
Posted: Jun 2, 2025
View