TINKER AFB MAC BOA WWYK250173, Replace Bowling Alley Roof, B5703

SOL #: FA813726R0029Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Recreational Buildings (Z2FB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 4, 2026
2
Last Updated
Jun 10, 2026
3
Submission Deadline
Jun 8, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, AFSC PZIOC, is soliciting proposals for the replacement of the Bowling Alley Roof (B5703) at Tinker Air Force Base, Oklahoma. This opportunity, designated as a Total Small Business Set-Aside, is exclusively for current MAC BOA holders who attended the mandatory site visit on May 20, 2026. The project, valued between $1M and $5M, requires comprehensive design/engineering and construction services. Proposals are due by June 8, 2026.

Scope of Work

The project, identified as WWYK250173, involves furnishing all design/engineering services, materials, labor, tools, transportation, equipment, testing, and quality control for the complete renovation of the roof on Building 5703. This includes a site investigation to verify existing conditions, providing any necessary assemblies for a fully operating system, and adhering to detailed architectural, civil, and mechanical drawings. Specific tasks include removal and installation of new metal and EPDM roofing, replacement of flashing, gutters, downspouts, and mechanical curbs, and associated wall finish and storm drain work. The facility will remain occupied during construction, requiring careful coordination.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (implied Firm Fixed Price)
  • Estimated Magnitude: $1,000,000 - $5,000,000
  • Period of Performance: 447 calendar days after Notice to Proceed (NTP)
  • Set-Aside: Total Small Business (100% Small Business Set-Aside)
  • NAICS Code: 236220 (Repair Or Alteration Of Recreational Buildings)
  • Size Standard: $45,000,000 Annual Receipts
  • Place of Performance: Building 5703, Tinker AFB, S Coffeyville, OK 73145

Eligibility & Submission

This opportunity is restricted to Tinker AFB MAC BOA Holders ONLY who attended the mandatory site visit on May 20, 2026. Proposals will be evaluated using a Lowest Priced Technically Acceptable (LPTA) source selection procedure.

  • RFIs Due: May 28, 2026
  • Proposals Due: June 8, 2026, by 02:00 PM local time.
  • Proposal Validity: Offers must be valid for at least 120 calendar days.

Key Requirements & Notes

Funds are not presently available for this contract; the Government's obligation is contingent upon fund availability. Key personnel (PM, Design PM, QCM, SSHO, Project Superintendent) must meet specific experience requirements. Contractor personnel require AFMC Form 387 badges for base access, and an Entry Access List (EAL) spreadsheet is provided for personnel requiring base access. The Statement of Work details quality control, health and safety (EM 385-1-1), and environmental considerations (potential ACM, HM, LBP). Design submissions (35%, 65%, 95%, 100%) are required, along with electronic submittals and a baseline design/construction schedule. Compliance with the Davis-Bacon Act wage determination for Oklahoma County is mandatory.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Jun 10, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jun 9, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Jun 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 20, 2026
Version 1
Combined Synopsis/Solicitation
Posted: May 4, 2026
View