Touchdown 08 Airfield Pavement Repair and Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Middle East District, anticipates soliciting proposals for Airfield Pavement Repair and Replacement at an undisclosed location in the Kingdom of Jordan. This pre-solicitation notice outlines plans for a Firm-Fixed Price (FFP) Design-Bid-Build (DBB) contract to extend the touchdown zone of Runway 08/26. The forthcoming Request for Proposal (RFP) is expected to have a response date around May 18, 2026.
Scope of Work
The primary effort involves replacing 13,504 square meters (SM) of Portland Cement Concrete (PCC) pavement and 13,354 SM of asphalt with new, modified-heavy load concrete. This work is intended to extend the touchdown zone of Runway 08/26 and must comply with International Civil Aviation Organization (ICAO) standards, including the replacement of associated lighting and markings. A secondary component includes design-after-award work for the foundational structure of Aircraft Arresting System (AAS) Absorber Shelters. The selected contractor must demonstrate capability in Civil Works, specifically earthwork, runway construction, or repair within the Kingdom of Jordan.
Contract & Timeline
- Type: Presolicitation for a Firm-Fixed Price (FFP) Design-Bid-Build (DBB) contract
- Competition: Full and Open Competition
- Set-Aside: None specified
- Anticipated Performance Period: 540 calendar days after Notice to Proceed
- Anticipated RFP Response Date: May 18, 2026
- Published: April 17, 2026
Evaluation
Award will be based on full and open competition using best value trade-off source selection procedures, in accordance with FAR Part 15 (Contracting by Negotiation) and FAR Part 36 (Construction and Architect-Engineer Contracts).
Additional Notes
This is a pre-solicitation notice; technical specifications, drawings, and other project details will be provided as attachments to the forthcoming RFP. Interested parties are encouraged to submit timely and complete proposals in response to the future RFP. No reimbursement will be made for costs incurred in responding to this notice or the RFP.