Towed Array Integrated Product Team (TAIPT) Telemetry and Engineering Services Follow On

SOL #: N6660425R0381SolicitationSole Source

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NUWC DIV NEWPORT
NEWPORT, RI, 02841-1703, United States

Place of Performance

Millersville, MD

NAICS

Search (334511)

PSC

Underwater Sound Equipment (5845)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 20, 2026
2
Submission Deadline
Apr 21, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Naval Undersea Warfare Center, Division Newport (NUWCDIVNPT) has released a sole source solicitation (N6660425R0381) for Towed Array Integrated Product Team (TAIPT) Telemetry and Engineering Services Follow On. This requirement is for L3 Technologies, Inc. Chesapeake Sciences to support the upgrade, production, and maintenance of surveillance, surface, and submarine towed array components. Proposals are due April 21, 2026.

Scope of Work

This opportunity requires comprehensive telemetry and engineering services for the Naval Array Technical Support Center (NATSC). Key tasks include:

  • Engineering Services: Approximately 40,300 hours over the contract duration, covering configuration management, engineering support, and repair/overhaul/upgrade of TAIPT systems.
  • Components: Provision of various components, with pricing detailed in Section B pricing tables, including provisions for Non-Recurring Engineering (NRE).
  • Data Deliverables: Extensive Contract Data Requirements Lists (CDRLs) for both engineering services (Exhibit A) and components (Exhibit B), including reports, meeting minutes, engineering change notices, and certificates of compliance.

Contract & Timeline

  • Type: Hybrid contract contemplating Cost Plus Fixed Fee, Cost-Reimbursable, and Firm Fixed Price elements.
  • Duration: Period of Performance from June 24, 2026, to June 23, 2031.
  • Set-Aside: Sole Source to L3 Technologies, Inc. Chesapeake Sciences.
  • Minimum Obligation: Ten (10) Non-Acoustic Sensor (NAS) Nodes.
  • Proposal Due: April 21, 2026, by 18:00Z.
  • Published: April 20, 2026.

Key Requirements & Compliance

Offerors must meet stringent security and performance standards:

  • Facility Clearance: Requires a "Secret" level facility security clearance and safeguarding.
  • CMMC Compliance: Must comply with DFARS 252.204-7021 and 252.204-7025, requiring Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self). Offerors need a current CMMC status and affirmation of continuous compliance in SPRS prior to award.
  • Performance Standards: Adherence to specific Performance Requirements Summary (Attachment 2) outlining acceptable quality levels (AQLs) and monitoring methods for all tasks.
  • OPSEC: Operations Security requirements are imposed.

Additional Notes

This is a follow-on requirement to N66604-21-D-L000. Amendments have updated CDRLs, performance requirements, and extended the response due date multiple times, with the latest amendment incorporating CMMC clauses.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Apr 20, 2026
Towed Array Integrated Product Team (TAIPT) Telemetry and Engineering Services Follow On | GovScope