Trac ACFT TWG U-30

SOL #: FA857126Q0064Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8571 MAINT CONTRACTING AFSC PZIM
ROBINS AFB, GA, 31098-1672, United States

Place of Performance

Warner Robins, GA

NAICS

Industrial Truck (333924)

PSC

Trucks And Truck Tractors, Wheeled (2320)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 17, 2026
2
Last Updated
Apr 17, 2026
3
Submission Deadline
May 1, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting quotes for the purchase of one Tractor Aircraft Tug U-30 (TMX-450-50) for the 402d Aircraft Maintenance Group (AMXG) at Robins Air Force Base (AFB), Georgia. This is a Brand Name requirement for TLD America Corporation. The solicitation, issued as a Request for Quote (RFQ) No. FA857126Q0064, requires the contractor to provide all equipment, transportation, documentation, manuals, and training. Quotes are due by May 1, 2026, at 1:00 PM EST.

Scope of Work

The primary deliverable is one Tractor Aircraft Tug U-30 (TMX 450-50) meeting CID A-A58026C, Class 1, with a GVW of 100,000 pounds, capable of towing aircraft up to 850,000 pounds GVW. Required options and accessories include a mirror on the front hitch, air conditioning, elevating front cab, obstacle detection, custom military green paint, automatic lubricating system, four integral hydraulic jacks, a rotating warning beacon, a rear camera, and an upgraded driver seat. The contractor must also provide training for 10 operators and 4 maintenance mechanics.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation, Request for Quote (RFQ) FA857126Q0064
  • Pricing: Firm Fixed Price
  • Set-Aside: Unrestricted
  • Delivery: FOB Destination to Robins AFB, GA, within 365 days After Receipt of Order (ARO).
  • Warranty: One-year service and parts warranty.
  • Questions Due: April 23, 2026, by 12:00 PM EST
  • Quotes Due: May 1, 2026, by 1:00 PM EST
  • Published: April 17, 2026

Compliance & Deliverables

Bidders must adhere to extensive compliance requirements and provide specific deliverables:

  • Industrial Safety & Health: A comprehensive Safety and Health Plan addressing items in Appendix C, which covers federal, state, local, OSHA, and Air Force requirements, including specific topics like PPE, hazardous energy control, and environmental controls. This plan (CDRL A004) is due within 10 working days after contract award.
  • Training: Mandatory initial Environmental Management System (EMS) Awareness Training (CDRL A002) and Energy Management System (EnMS) Training (CDRL A003) for all contractor personnel working on Robins AFB.
  • Documentation: Two hard copies and one electronic copy of Commercial Off-The-Shelf (COTS) operation and service/maintenance manuals (CDRL A001) are required at delivery.
  • Accident Reporting: Strict procedures for telephonic and electronic reporting of accidents/incidents (CDRL A005) within specified timelines.
  • Security: Adherence to Government Security Regulations, COMSEC, and OPSEC, including installation access and visitor policies.
  • Environmental: Elimination of Class I Ozone Depleting Substances (ODS) and compliance with EPA/USDA bio-based product requirements.
  • Identification: Unique Item Identification (UID) is required for all items delivered to the DoD.

Evaluation

Award will be made to the responsible offeror whose quote, conforming to the solicitation, represents the lowest price.

Contact Information

People

Points of Contact

Robert RobinsonSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 2
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 17, 2026