TRANSDUCER,MOTIONAL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Mechanicsburg is soliciting proposals for the manufacture and supply of a TRANSDUCER,MOTIONAL. This is a Solicitation for potential bidders, with proposals due by April 17, 2026. Award will be based on Lowest Price Technically Acceptable (LPTA) criteria.
Scope of Work
This contract requires the manufacture and adherence to specific quality requirements for the TRANSDUCER,MOTIONAL. Key specifications include physical identification in accordance with MIL-STD-130, REV N, 16 NOV 2012, and packaging in accordance with MIL-STD 2073. The item must conform to the design represented by specified Cage Code(s) and reference number(s) (e.g., 8FGX3 W154815).
Contract & Timeline
- Type: Solicitation
- Set-Aside: None specified
- Proposal Due: April 17, 2026, 8:30 PM EDT
- Published: March 18, 2026
- Evaluation: Lowest Price Technically Acceptable (LPTA) per DFARS 215.101-2-70(a)(1)(i).
Key Requirements & Notes
- Drawings/Technical Data: Not available for this item.
- OEM/Distributor: Offerors who are not the manufacturer must state the Original Equipment Manufacturer (OEM) CAGE code and part number. Consideration for award will only be given to authorized distributors, who must provide proof on company letterhead with their offer.
- Electronic Invoicing: Any resulting order will require electronic submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF. Contractors are encouraged to register for PIEE EDA at
https://piee.eb.mil/to view orders and modifications. - Production Facility Changes: Changes to production facilities require written approval from the Contracting Officer and may necessitate a $250 price reduction to cover administrative costs.
- Inspection: Contractor is responsible for all inspection requirements, with records maintained for 365 days post-delivery. DLA Procurement Note E06 (Inspection and Acceptance at Source) applies.
Contact Information
For follow-up communications, please provide an email address. The primary contact is QUINTON.CRENSHAW@DLA.MIL (Phone: 717-550-3838).