TRANSFORMER,POWER
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy (NAVSUP WEAPON SYSTEMS SUPPORT MECH) is soliciting quotations for 12 units of TRANSFORMER, POWER (NSN: 1HM 5950-01-545-0578 L1). This is a "LEVEL ONE" and "SPECIAL EMPHASIS" item, critical for shipboard systems where failure could lead to serious personnel injury, loss of life, or loss of vital systems. This is a "DX" rated order under the Defense Priorities and Allocations System (DPAS). Quotations are due by May 13, 2026.
Scope of Work
The requirement is for transformer assemblies manufactured in accordance with Bendix Corporation drawing 3337813, including specific amplifications and modifications detailed in the RFQ. Key requirements include:
- Material Certification: Quantitative chemical and mechanical analysis for specific parts (Housing, Weldwasher, Spools and Plugs) per SAE-AMS-QQ-S-763, class 302 or 304.
- Testing & Certification: Visual Magnification/Dye Penetrant Inspection, Intergranular Corrosion Test, and Functional tests.
- Welding & Brazing: Compliance with standards (e.g., S9074-AR-GIB-010/248, 0900-LP-001-7000) and qualified personnel/procedures.
- Thread Inspection: Adherence to FED-STD-H28 series.
- Packaging: In accordance with MIL-STD-2073.
- Certificate of Compliance: DI-MISC-80678, certifying compliance with procurement document requirements.
- Quality System: Required to be ISO-9001 or MIL-I-45208 compliant.
- Traceability: Critical for Level I/SUBSAFE systems, requiring traceability to test reports and Objective Quality Evidence (OQE).
Contract & Timeline
- Contract Type: Solicitation (RFQ), "DX" rated order.
- Delivery: Required within 620 days after the effective date of the resulting contract.
- Quotations Due: May 13, 2026.
- CDRLs Submission: Certification Data CDRLs required 20 days prior to scheduled delivery.
- Weld Data Submission: Weld procedure and qualification data required 120 days after contract award, with approval 60 days after receipt.
- PNSY Review: PNSY review/acceptance of Certification CDRLs within 6 working days after receipt.
Set-Aside
No specific set-aside is mentioned.
Evaluation
Evaluation will consider past performance as more important than price.
Additional Notes
Inspection and Acceptance will occur at the Contractor's Plant. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). The point of contact is Benjamin Spangler, who can be reached at 771-229-0573 or benjamin.t.spangler.civ@us.navy.mil.