Trusted Microelectronics Assurance Center (TMAC) - Notice of Intent
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE) Louisville District has issued a Special Notice / Notice of Intent regarding the upcoming Trusted Microelectronics Assurance Center (TMAC) construction in Crane, IN. This notice is not a solicitation for the main construction contract but seeks to identify interested parties capable of providing specific brand-name equipment that USACE intends to sole-source for the project.
Scope of Intent
USACE plans to include sole-source requirements for the following equipment within the future TMAC construction contract:
- Schneider Electric Power Logic, Ion Meters, and SCADAPack Smart RTUs Advanced Metering Infrastructure (AMI meters): For energy consumption monitoring.
- FedSig MNS and FedSig Ultra Voice Remote Interface (UVRU): For communication with the base fire alarm system.
- Schlage electrified door locks and Lockmasters panic hardware: To comply with NSWC Crane requirements.
- Sigcom DTX fire alarm radio transmitter: Required for compatibility with existing base receivers.
Action & Timeline
- Purpose: To allow interested parties to challenge the sole-source requirements.
- Submission: Capability statements must be submitted in writing, detailing the ability to meet the described requirements.
- Response Due: May 4, 2026, by 11:00 AM ET.
- Published: April 17, 2026.
- Place of Performance: Crane, IN.
Additional Notes
This is a market research effort. All responsible sources may submit a capability statement for agency consideration. This notice does not constitute a solicitation for competitive proposals for the overall TMAC construction.