TUNING UNIT,RADIO F
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP Weapon Systems Support (WSS) Mechanicsburg, has issued a Solicitation for the repair of TUNING UNIT,RADIO F (PSC 5915 - Filters And Networks). This opportunity is issued under Emergency Acquisition Flexibilities (EAF) and seeks qualified contractors to perform repairs with a required Repair Turnaround Time (RTAT) of 119 days. Government Source Inspection (GSI) is required, and only authorized distributors of the original manufacturer's item will be considered for award.
Scope of Work
This Request for Quote (RFQ) is for the repair of the TUNING UNIT,RADIO F, ensuring it meets operational and functional requirements. All repair work must adhere to the contractor's standard practices, manuals, and directives, including technical orders and approved repair standards. Key aspects include:
- Repair Turnaround Time (RTAT): A mandatory 119-day RTAT, measured from asset return to acceptance. Contractors must provide capacity constraints if unable to meet this.
- Quality Assurance: The contractor is responsible for all inspection requirements, including testing repaired items per original manufacturer's specifications. Records must be maintained for 365 days.
- Marking: Items must be identified in accordance with MIL-STD-130, REV N.
- Packaging: MIL-STD 2073 applies.
- Beyond Repair (BR/BER): Provisions for T&E fees if an asset is determined to be BR/BER.
- Price Reductions: A 3% price reduction per unit will be incurred for failure to meet the required RTAT.
Contract & Timeline
- Type: Solicitation (RFQ for Repair), resulting in a bilateral award requiring contractor acceptance.
- Set-Aside: None specified.
- Response Due: May 21, 2026, at 8:30 PM EDT.
- Published: May 8, 2026.
- Freight: FOB Origin, handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.
Key Requirements for Response
Quotes must include:
- Unit Price and Total Price.
- Proposed Repair Turnaround Time (RTAT) in days.
- If not meeting the 119-day RTAT, provide capacity constraints.
- T&E fee/price if asset is determined BR/BER.
- Awardee CAGE, Inspection & Acceptance CAGE, and Facility/Subcontractor CAGE.
- New unit price and delivery lead-time for comparison.
- Proof of Authorized Distributorship: Required on company letterhead, signed by a responsible official.
Additional Notes
This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF), encouraging accelerated delivery. Offerors must verify nomenclature, part number, and NSN prior to responding. Government Source Inspection (GSI) is mandatory. Contact: For inquiries, contact Nicole Diehl at NICOLE.A.DIEHL.CIV@US.NAVY.MIL or 717-605-5415.