TX FLAP UV CR203(1) Fish Hatchery Road
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
TX FLAP UV CR203(1) Fish Hatchery Road
The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.