Unaccompanied Enlisted Personnel Housing (UEPH), Joint Base Myers Henderson-Hall (JBMHH), Fort Myer, Virginia
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The US Army Corps of Engineers, Baltimore District is soliciting proposals for the construction of Unaccompanied Enlisted Personnel Housing (UEPH) at Joint Base Myer-Henderson Hall (JBMHH), Fort Myer, Virginia. This project involves building standard design barracks for 200 Soldiers and demolishing existing structures. Proposals are due by June 11, 2026, at 11:00 AM EDT.
Scope of Work
This opportunity requires the construction of new barracks to accommodate 200 Soldiers, including living quarter suites, clothes, steam, and barber rooms. Key features include cybersecurity and antiterrorism/force protection (AT/FP) measures, building information systems, fire protection and alarm systems, intrusion detection system (IDS) installation, and energy monitoring control systems (EMCS) connection. Sustainability and energy enhancement measures are integrated into the design.
Supporting facilities encompass site development with demolition of 16 buildings (30,897 Total SF), utilities and connections, storm drainage, paving, parking, walkways, lighting, information systems, landscaping, and signage. Heating and air conditioning will be provided by a self-contained system (estimated 420 Tons). The project must adhere to Department of Defense (DoD) Minimum Antiterrorism for Building standards and Unified Facilities Criteria (UFC 1-200-02) for a minimum 40-year life, including energy efficiencies. Comprehensive building and furnishing related design services are required, ensuring accessibility for individuals with disabilities.
Contract & Timeline
- Type: Solicitation
- Duration: 1460 calendar days (approximately 4 years) from Notice to Proceed.
- Set-Aside: None specified.
- Solicitation Posted: April 15, 2026
- Site Visit: April 24, 2026
- RFIs Due: May 7, 2026, at 9:00 AM (extended by Amendment 0001)
- Proposals Due: June 11, 2026, at 11:00 AM EDT (extended by Amendment 0005)
- Published Date: May 29, 2026
Evaluation
No specific evaluation criteria were provided in the description.
Additional Notes
This opportunity has undergone several amendments. Amendment 0001 extended the RFI due date to May 7, 2026. Amendment 0002 extended the proposal due date to June 4, 2026, and provided revised documents. Amendment 0003 corrected specifications, and Amendment 0004 provided further revised documents and government responses. Most recently, Amendment 0005 extended the proposal due date to June 11, 2026, at 11:00 AM EDT. Offerors should review all amendments and attachments, especially the revised drawings, specifications, and supplemental price schedules.