Underground Utilities Improvement, Minneapolis Air Route Traffic Control Center (ZMP ARTCC), Farmington, MN

SOL #: 697DCK-26-R-00267Solicitation

Overview

Buyer

Transportation
Federal Aviation Administration
697DCK REGIONAL ACQUISITIONS SVCS
FORT WORTH, TX, 76177, United States

Place of Performance

Farmington, MN

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Repair Or Alteration Of Radar And Navigational Facilities (Z2BC)

Set Aside

No set aside specified

Timeline

1
Posted
May 27, 2026
2
Submission Deadline
Jul 2, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Aviation Administration (FAA) is soliciting offers for IIJA Underground Utility Improvements at the Minneapolis Air Route Traffic Control Center (ZMP ARTCC) in Farmington, MN. This project, estimated between $2.5 million and $4 million, is a Small Business Set-Aside under NAICS 237110. The work involves comprehensive upgrades to stormwater, sanitary sewer, drain tile, and domestic water systems. Proposals are due July 2, 2026, by 5:00 PM Central Time.

Scope of Work

The project encompasses demolition of existing utility infrastructure and construction of new systems. Key tasks include:

  • Demolition: Removal of existing sanitary and storm lift stations, drain tile lift station, cooling tower pump house, concrete foundations, pavements, and associated utilities. Vacuum excavation is required for initial excavation.
  • New Construction:
    • Sanitary Sewer: Replacement of lines, installation of a new sanitary lift station, precast concrete manholes, and cleanouts.
    • Stormwater: Installation of new storm sewer lines, manholes, curb inlets, catch basins, and reconstruction of drainage systems, including a new courtyard storm lift station.
    • Domestic Water: Replacement of laterals, valves, fittings, and reconstruction of the water system serving the Cooling Tower and Pump House.
    • Electrical: Provision of electrical service, power distribution, control panels, and integration with the Facility Building Automation System (BAS) for all new lift stations and site utilities.
    • Civil Site Restoration: Restoration of disturbed pavements, curbs, sidewalks, striping, fencing, landscaping, and ADA-compliant areas.
  • Standards & Specifications: Work must adhere to detailed engineering drawings, project specifications, FAA-C-1217H Chg 2 (electrical requirements), and FAA-STD-019G (lightning protection, grounding, ESD). Prevailing wage rates per GDN MN20260053 for Hennepin County, MN, apply.

Contract Details

  • Contract Type: Anticipated Firm Fixed-Price.
  • Set-Aside: Small Business.
  • NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction (Size Standard: $45.0 Million).
  • Estimated Value: $2,500,000 - $4,000,000.
  • Period of Performance: 180 days after Notice to Proceed.
  • Bonds: Performance and Payment Bonds are required.
  • Agency: Federal Aviation Administration (FAA), 697DCK Regional Acquisitions Svcs.
  • Place of Performance: Farmington, MN 55024.

Submission & Evaluation

  • Evaluation Criteria: Lowest Price Technically Acceptable (LPTA).
  • Mandatory Site Visit: June 10, 2026, at 10:00 AM Central Time. RSVP by emailing Alexander Meyer (Alexander.L.Meyer@faa.gov) and Samuel Lutzke (Samuel.Lutzke@faa.gov).
  • Questions Due: June 16, 2026, by 5:00 PM Central Time. Submit in writing to Richard.L.Palsgrove@faa.gov and Karen.V-CTR.Czerwiec@faa.gov.
  • Proposals Due: July 2, 2026, by 5:00 PM Central Time.
  • Requirements: Active registration in SAM is mandatory. Offerors must acknowledge all amendments.

People

Points of Contact

Ryan PalsgrovePRIMARY
Karen CzerwiecSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: May 27, 2026
Underground Utilities Improvement, Minneapolis Air Route Traffic Control Center (ZMP ARTCC), Farmington, MN | GovScope