Unidirectional Hydrant Flushing and Repair Program
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Army Contracting Command – Aberdeen Proving Ground (ACC APG), on behalf of the Directorate of Public Works (DPW), is seeking contractor support for a Unidirectional Hydrant Flushing and Repair Program at APG South (Edgewood) and the Adelphi Laboratory Center. This acquisition is being conducted under Two-Step Sealed Bidding procedures (Revolution FAR Overhaul (RFO) Part 14). Responses are due July 6, 2026.
Scope of Work
The selected contractor will be responsible for performing all tasks necessary to execute APG's unidirectional flushing program. This includes producing all associated documentation and data deliverables for the program.
Contract & Timeline
- Type: Invitation for Bid (IFB) under Two-Step Sealed Bidding
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 237110 – Water and Sanitary Line and Related Structures Construction (Small Business Size Standard: $45 Million)
- Response Due: July 6, 2026, 6:00 PM ET
- Published: June 16, 2026
Evaluation
The Two-Step Sealed Bidding process involves:
- Step One: Submission, evaluation, and acceptance of technical proposals without pricing.
- Step Two: Issuance of an Invitation for Bids (IFB) only to those offerors whose Step One technical proposals are determined acceptable.
Additional Notes
Award is contingent upon the availability of appropriated funds. The Government reserves the right to cancel this requirement at any time without obligation or liability for proposal preparation costs. Interested parties should refer to the PIEE Solicitation Module for full details and submission instructions.