*UPDATE* University Mountain Tower Remediation - LPGBS Design

SOL #: 6973GH-26-R-00077Solicitation

Overview

Buyer

Transportation
Federal Aviation Administration
6973GH FRANCHISE ACQUISITION SVCS
OKLAHOMA CITY, OK, 73125, United States

Place of Performance

Missoula, MT

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Repair Or Alteration Of Electronic And Communications Facilities (Z2BG)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 10, 2026
2
Last Updated
Feb 12, 2026
3
Submission Deadline
Feb 19, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Aviation Administration (FAA), under the Department of Transportation, has issued a Solicitation for University Mountain Tower Remediation - LPGBS Design in Missoula, MT. This Total Small Business Set-Aside opportunity involves comprehensive repair and alteration of electronic and communications facilities, specifically a 65' guyed lattice-based communication tower. The scope includes guy wire tensioning, lightning protection system installation, corrosion abatement, and mounting hardware installation. Offers are due by February 19, 2026, at 5:00 PM CST.

Scope of Work

This contract requires the contractor to perform remediation tasks on a 65' guyed lattice-based communication tower at University Mountain, Missoula, MT. Key tasks include:

  • Guy Wire Tensioning: Implement tensioning per TIA-222 Rev. H specifications (Leg A, B, C: 1-7 1/4"). Minor repairs to achieve proper and uniform tension are also required.
  • Lightning Protection Systems (LPS): Install a Class I LPS as detailed in the provided design drawings, including specific components like air terminals, conductors, clamps, and grounding methods for guy wires and anchors. Grounding connections must meet NFPA 780 standards (10 ohms preferred, 25 ohms maximum).
  • Corrosion Abatement: Perform corrosion abatement and control on the tower and guy system.
  • Mounting Hardware: Install industry-designed mounting hardware for proper transmission line support.

The contractor is responsible for all labor, tools, equipment, materials, and technical expertise. This scope does not include on-site logistics; the vendor must manage permits, site access, and safe work zones. All work must be completed within 30 days of the Notice to Proceed.

Contract Details

  • Opportunity Type: Solicitation
  • Solicitation Number: 6973GH-26-R-00077
  • Agency: Department of Transportation, Federal Aviation Administration (FAA)
  • Office: 6973GH FRANCHISE ACQUISITION SVCS
  • Place of Performance: University Mountain, Missoula, MT (Latitude 46°51'5.43"N, Longitude 113°55'39.77"W)
  • Product Service Code: Z2BG (Repair Or Alteration Of Electronic And Communications Facilities)
  • NAICS Code: 237130 (Small Business Size Standard: $45,000,000.00)

Set-Aside

This acquisition is a Total Small Business Set-Aside (FAR 19.5), 100% reserved for small businesses.

Submission & Evaluation

Offers must be submitted electronically via email to edward.b.wright@faa.gov by the specified due date and time. Submissions must include item/sub-item quantities, unit prices, time and place of delivery, all required representations and information, and a statement of agreement with the FAA's terms, conditions, and provisions. The FAA may decline offers that do not include required information or reject any terms.

Key Dates & Contact

  • Published Date: February 12, 2026
  • Offer Due Date: February 19, 2026, 5:00 PM CST
  • Primary Contact: Edward Wright (edward.b.wright@faa.gov, 405-954-0693)

Deliverables

Key deliverables include a preliminary project schedule, a final project schedule and remediation plan, a final report with site activity documentation and tensioning test data, photographic documentation of below-grade work, and all field reports, photos, site assessments, and data packages submitted within 30 days of site completion.

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Feb 12, 2026
Version 2
Solicitation
Posted: Feb 12, 2026
View
Version 1
Solicitation
Posted: Feb 10, 2026
View
*UPDATE* University Mountain Tower Remediation - LPGBS Design | GovScope