Upgrade 45-ton AAON split system HVAC unit at USCG COMCOM

SOL #: 31040RFQ260000372Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE PORTSMOUTH(00027)
PORTSMOUTH, VA, 23704, United States

Place of Performance

Virginia Beach, VA

NAICS

Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing (333415)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment (J041)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 8, 2026
2
Submission Deadline
Jun 2, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The US Coast Guard (USCG) is soliciting quotes for the upgrade of a 45-ton AAON split system HVAC unit at the USCG Communication Command in Virginia Beach, VA. This is a Total Small Business Set-Aside procurement, contemplating a Firm-Fixed Price order. Quotes are due by June 2, 2026, at 5:00 PM ET.

Scope of Work

The work involves providing all labor, materials, and equipment to:

  • Repair/replace a leaking discharge pressure transducer on circuit #1 of the 45-ton AAON HVAC unit.
  • Recover refrigerant, replace the transducer, vacuum, and recharge with 75 lbs. of R410A.
  • Upgrade the control interface by removing the failed unit and associated wiring, installing a new communications cable, and a new control interface with associated wiring and components.
  • Commission and thoroughly test the system to ensure reliable 24/7 operation for the RTF PUNGO server room.
  • Provide an operational demonstration of the new control system to the site manager. Work must be performed by technicians authorized/certified to work on AAON systems.

Contract & Timeline

  • Contract Type: Firm-Fixed Price order.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS: 333415 (Air Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing) with a 1,250-employee size standard.
  • Product Service Code: J041 (Maintenance, Repair And Rebuilding Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment).
  • Period of Performance: Parts and materials ordered within 3 days of award; work completed within 1 month of award (pending lead times).
  • Response Due: June 2, 2026, by 5:00 PM ET.
  • Published Date: May 8, 2026.

Evaluation & Submission

Award will be made to the lowest price technically acceptable (LPTA) quote, based on Technical Capability and Price (FAR 52.212-2). Quotes must be submitted via SF-18 to frank.r.burton@uscg.mil and keven.d.weaver@uscg.mil. Offerors must be registered and active in SAM.gov. Invoices will be submitted through the Invoice Processing Platform (IPP).

Site Visit

A site visit is strongly encouraged and will be held on May 26, 2026, at 11:00 AM ET at USCG Communication Command, 1900 Indian River Road, Virginia Beach, VA 23456. Interested parties must arrange visits with Nate Chappell (757-483-8792, Nathan.C.Chappell@uscg.mil) and Hayden Heyer (757-375-1183, Gary.H.Heyer@uscg.mil). Visitors require a visitor access request form, valid Real ID/Passport, or Military ID/RAPIDGate pass.

Key Requirements for Bidders

  • Maintain active SAM.gov registration.
  • Comply with all incorporated FAR and HSAR clauses, including those related to sustainable products, DEI, and Clean Air Act for refrigerants.
  • Adhere to Department of Labor Wage Determination rates for service employees.
  • Identify a Project Manager as Key Personnel in the proposal.
  • Contractor employees must wear identification badges and comply with Government regulations.

People

Points of Contact

Keven WeaverPRIMARY
Frank BurtonSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: May 8, 2026
Upgrade 45-ton AAON split system HVAC unit at USCG COMCOM | GovScope