Upper Wide-Angle Viewing System (UWAVS) Instrumentation and Control (I&C) Subsystem

SOL #: RFI_26_014_KSPre-Solicitation

Overview

Buyer

Energy
Energy, Department Of
PRINCETON LAB - DOE CONTRACTOR
Princeton, NJ, 08540, United States

Place of Performance

Place of performance not available

NAICS

Search (334511)

PSC

Antennas, Waveguide, And Related Equipment (5985)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 25, 2025
2
Last Updated
Nov 25, 2025
3
Response Deadline
Apr 30, 2026, 8:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Princeton Plasma Physics Laboratory (PPPL), under the Department of Energy, has issued a Presolicitation Notice for the Upper Wide-Angle Viewing System (UWAVS) Instrumentation and Control (I&C) Subsystem. This notice provides draft procurement documentation for review by potential suppliers for the ITER project. Three RFPs are expected by May 2026.

Opportunity Details

PPPL is completing the design of the UWAV diagnostic system for ITER and is making draft procurement documents available to allow potential suppliers to prepare in advance. This is an opportunity to review the requirements and provide feedback before the formal solicitations are issued.

Scope of Work (Based on Draft SOW)

The Statement of Work (SOW) outlines requirements for the manufacture, inspection, and testing of the UWAVS I&C subsystem. This includes:

  • Manufacturing, procurement, and delivery of I&C components and software for four upper ports (2, 8, 11, 14) of the ITER facility.
  • Fabrication, assembly, and testing to ensure compliance with detailed requirements.
  • Extensive documentation throughout the project lifecycle, including Manufacturing Readiness Review (MRR), First Article Test (FAI), Factory Acceptance Testing (FAT), Delivery Readiness Review (DRR), and Site Acceptance Test (SAT) support.
  • The I&C control scope encompasses Master, Support, and Camera Cubicles.
  • The project will be implemented in two phases: Phase 1 (Preparation for Manufacturing) and Phase 2 (Manufacturing).
  • Key documentation requirements include System Requirements Specification (SRS), System Design Specification (SDS), Software Architecture and Design Description (SADD), System Manufacturing Specification (SMS), Quality Plan, Inspection Plans, and various test reports.
  • A robust Quality Assurance Program is mandatory, covering inspections, audits, and supplier responsibility for conformance.

Reference Documents

Attachment 3 - Current Reference List (CRL) (DRAFT) provides a comprehensive list of applicable, reference, and for-information documents. Bidders must review these to understand the technical specifications, standards, and regulatory landscape. The "DRAFT" status indicates that some requirements may be subject to change.

Contract & Timeline

  • Type: Presolicitation (RFPs expected by May 2026)
  • Set-Aside: None specified
  • Published: November 25, 2025
  • Comments/Questions Due: April 30, 2026

Action Items

Interested parties are invited to submit voluntary comments or questions on the draft documents, particularly regarding the clarity of the Statements of Work or requirements. PPPL may post questions and responses publicly without revealing the enquirer's identity. Requests for copies of referenced documents can also be submitted.

Contact Information

Direct all comments or questions electronically to Khalif Stripling at kstripli@pppl.gov. Please reference PPPL RFI_26_014_KS UWAVS Instrumentation and Control (I&C) Subsystem in the subject line.

People

Points of Contact

Khalif StriplingPRIMARY

Files

Files

Download
Download

Versions

Version 2
Pre-Solicitation
Posted: Nov 25, 2025
View
Version 1Viewing
Pre-Solicitation
Posted: Nov 25, 2025
Presolicitation Notice for Upper Wide-Angle Viewing System (UWAVS) Instrumentation and Control (I&C) Subsystem | GovScope