Upper Wing and Elevon Heater Carriage Hardware

SOL #: 80NSSC26927176QCombined Synopsis/Solicitation

Overview

Buyer

National Aeronautics And Space Administration
National Aeronautics And Space Administration
NASA SHARED SERVICES CENTER
STENNIS SPACE CENTER, MS, 39529, United States

Place of Performance

Edwards, CA

NAICS

Engineering Services (541330)

PSC

Installation Of Equipment: Miscellaneous (N099)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 16, 2026
2
Submission Deadline
Mar 23, 2026, 12:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Aeronautics and Space Administration (NASA), through its NASA Shared Services Center, is seeking quotes for Upper Wing and Elevon Heater Carriage Hardware. This is a Brand Name or Equal To requirement for fabricating and delivering test hardware components for an upcoming ground test at NASA Armstrong Flight Research Center (AFRC) in Edwards, CA. This opportunity is a Total Small Business Set-Aside. Quotes are due by March 23, 2026, at 7 a.m. CT.

Scope of Work

The contractor will be responsible for the fabrication and delivery of specific components for the Upper Wing and Elevon Heater Carriages, as detailed in provided design drawings. This includes manufacturing various parts such as I-BEAM ASSY, C-CHANNELS, CARRIAGE FRAMES, ACTUATOR MOUNTS, and LINKAGES. The hardware is intended for a ground test effort at NASA AFRC.

Contract & Timeline

  • Opportunity Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Place of Performance: NASA Armstrong Flight Research Center, Edwards, CA 93524, United States
  • Period of Performance: Maximum of 12 weeks after contract award for fabrication and delivery; earlier completion is desirable.
  • Quote Due Date: March 23, 2026, at 7 a.m. CT
  • Questions Due Date: March 20, 2026, at 1 p.m. CT (written via email only)
  • Published Date: March 16, 2026

Submission & Evaluation

  • Submission: Quotes must be submitted via email to Shanna Patterson (shanna.l.patterson@nasa.gov). The email subject line must reference the tracking number 80NSSC26927176Q.
  • Quote Requirements: Include CAGE/UEI Code, FOB Destination, Leadtime for Delivery, Point of Contact (POC) Name & Email, and confirmation of compliance with associated Q Docs (AFRC). Quotes must list two points of contact (name, phone, email) and remain valid for 30 days.
  • Evaluation Criteria: Award will be based on a best value determination considering: Lowest price, Fabrication duration, Past performance information (requiring 3 references), and Technical acceptability.
  • Eligibility: Offerors must be registered at www.sam.gov and provide specific representations and certifications, including those related to small business status.

Special Requirements & Notes

  • CUI Drawings: The design drawings are deemed Controlled Unclassified Information (CUI) and are only available by request to approved vendors capable of receiving and handling CUI documents.
  • Certification of Conformance (CoC): All suppliers must provide a valid and readily identifiable CoC with each shipment, detailing mandatory information such as supplier name, PO#, part#, quantity, lot/batch/serial numbers, and a conformance statement. Non-OEM/Authorized Distributor suppliers must provide clear traceability to the OEM/Authorized Distributor.
  • Manufacturing & Quality Plans: Contractors must provide a manufacturing process plan for the Upper Elevon Heater Carriage components and a quality plan for ensuring dimensional tolerances.
  • Delivery Coordination: Contractors must inform NASA one week in advance of hardware delivery.
  • Payment: The government does not pay by credit card.
  • Status Updates: Email status updates on fabrication are required every three weeks to the Technical POC.

People

Points of Contact

Shanna PattersonPRIMARY

Files

Files

Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 16, 2026