U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid

SOL #: W912P726NF01Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST SAN FRAN
SAN FRANCISCO, CA, 94102-3406, United States

Place of Performance

Place of performance not available

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Construction Of Epg Facilities Solar (Y1MG)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 31, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army 63rd Readiness Division is planning a MILCON ERCIP Microgrid project in Mountain View, Santa Clara County, California. This Total Small Business Set-Aside procurement aims to enhance energy resilience for mission-critical functions, with an estimated cost range of $10,000,000 to $25,000,000. The solicitation (RFP W9123826RA016) is anticipated to be released around April 15, 2026, with proposals due around May 15, 2026.

Scope of Work

This project involves the installation of a microgrid system designed to provide 14+ days of energy resilience. Key components include:

  • A ground-mounted 750kW photovoltaic (PV) solar system with low voltage switchgear.
  • A 750kWh battery energy storage system (BESS).
  • An 800kW diesel backup generation system with a 10,000-gallon fuel storage tank.
  • A master microgrid controller and automatic smart switches for resource control.

The system will feature full islanding capability and be installed on a closed restricted network (CRN), requiring an Authority to Operate (ATO) per DODI 8510.01. Cybersecurity requirements will adhere to UFC 4-010-06.

Contract Details

  • Contract Type: Presolicitation
  • PSC: Y1MG (Construction Of Epg Facilities - Solar)
  • NAICS: 237130 (Commercial and Institutional Building Construction), with a $45,000,000 size standard.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Estimated Cost: $10,000,000 to $25,000,000
  • RFP Number: W9123826RA016
  • Agency: DEPT OF THE ARMY, W075 ENDIST SAN FRAN

Key Dates

  • Anticipated Solicitation Release: On/about April 15, 2026
  • Anticipated Proposal Due Date: On/about May 15, 2026, 12:00 PM PDT (specific date/time in solicitation)

Important Information for Offerors

  • This project may be delayed, cancelled, or revised at any time.
  • Offerors and subcontractors must be registered in SAM.gov and PIEE to view/download solicitation information and submit offers. Registration should be completed at least one week prior to the anticipated solicitation release.
  • Solicitation documents, plans, and specifications will be available only through the PIEE website (https://piee.eb.mil).
  • Offers MUST BE submitted electronically via the PIEE website.
  • Offerors are responsible for monitoring PIEE and SAM for the solicitation and any amendments. USACE will not provide direct notifications.
  • Refer to attached PIEE instructions for vendor access and proposal submission guidance.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 1Viewing
Pre-Solicitation
Posted: Mar 31, 2026
U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid | GovScope