U.S. Consulate Johannesburg Construction work at Trebyam 7
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of State, Bureau of Overseas Buildings Operations (OBO), through the U.S. Embassy Pretoria, has issued a Presolicitation for Construction Services at 7 Trebyam Avenue, Edenburg, Sandton, Johannesburg, South Africa. This project involves selective improvements to a newly acquired building for staff diplomatic housing. The solicitation is expected to be posted on June 15, 2026, with proposals due by July 14, 2026.
Scope of Work
The contractor will provide complete construction services, coordination, and supervision for selective improvements to an existing building. This includes exterior and interior security, and accessibility feature enhancements. The work must meet contract requirements within established schedules and the awarded amount, consistent with OBO's mission for U.S. diplomacy facilities abroad. The project does not require Building Information Modeling (BIM), but any models produced must comply with OBO Deliverable Requirements (ODR 1). Cultural Heritage requirements are not applicable.
Contract & Timeline
- Opportunity Type: Presolicitation
- Product Service Code: Y1FA (Construction Of Family Housing Facilities)
- Place of Performance: Johannesburg, South Africa
- Solicitation Posting Date: Expected June 15, 2026
- Response Date: July 14, 2026, 09:00 PM SAST (for the upcoming solicitation)
- Published Date: June 3, 2026
- Set-Aside: None specified
Special Requirements
- Permits & Licenses: Contractor is responsible for obtaining all necessary permits and fees.
- Safety: Compliance with US Army Corps of Engineers (ACOE) Safety and Health Requirements Manual (EM 385-1-1) and local labor codes (whichever is more stringent), plus DOSAR 652.236-70.
- Deliverables: Submission of project management plans, quality management plans, construction safety management systems, meeting documentation, assessments, surveys, studies, strategies, designs, reports, specifications, and submittals.
- Submittals: Require review and approval by the Contracting Officer's Representative (COR) at least 10 working days prior to work. "As-built" drawings and final material certifications are required upon completion.
- OBO Requirements: Adherence to the 2025 Edition of OPSR 5 (OBO Deliverable Requirements), applicable bulletins, and host country's local building codes.
Contact Information
- Primary: Ian Zaur, zaurim@state.gov, +27791111816
- Secondary: Johann Baasden, baasdenjw@state.gov, +27648163185