USACE SPK DB DBB Construction $99M Small Business MATOC California and Utah
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The United States Army Corps of Engineers (USACE), Sacramento District (SPK), requires a design-build (DB) and design-bid-build (DBB) ? Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Construction Services in support of SPK programs located primarily in the following army installations: Military Ocean Terminal Concord (MOTCO)/ Bay Area/ Central California, Presidio of Monterey/ Fort Hunter Liggett/ Camp Parks/ Camp Roberts/ DDJC Tracy. Secondary locations within the Sacramento boundaries of California and Utah. Specific needs will be determined based upon project requirements as described in each task order. Selected firms will work on a variety of projects that may include but not necessarily limited to new construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional buildings and related structures. Anticipated work may include the following: New facilities to include but not limited to: Access Control Points, water tower, pavement repair and renovation of existing facilities to include but not limited to administrative buildings, training rooms, interior/exterior repairs, roofing, building mechanical systems (e.g. HVAC). Utility Infrastructure to include but not limited to water lines, sewer lines, roads, electrical, and communication utilities.-----AMENDMENT 0001 IS ISSUED TO:UPDATE SECTION 00 21 00, PARAGRAPH 2.7 TOTAL PAGE LIMIT AND 3 TOTAL PAGE LIMIT, IN ATTACHMENT 5.-----AMENDMENT 0002 IS ISSUED TO: UPDATE SECTION 00 21 00, IN ATTACHMENT 5.