USACE SPK Design Build (DB) Construction, NSA-U Consolidation Mission Facility, Utah-Virtual Industry Day

SOL #: W9123826S0001-Virtual-Industry-DaySpecial Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST SACRAMENTO
SACRAMENTO, CA, 95814-2922, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Administrative Facilities And Service Buildings (Y1AZ)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
Apr 13, 2026
3
Action Date
Jan 8, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

This Special Notice from the U.S. Army Corps of Engineers (USACE), Sacramento District (SPK) provides information from a Virtual Industry Day held on January 14, 2026, for the upcoming Design-Build (DB) Construction of the NSA-U Consolidation Mission Facility in Utah. The project has an estimated magnitude of $250,000,000 – $500,000,000 and will be a Firm-Fixed Price (FFP) contract.

Project Overview

The NSA-U Consolidation Mission Facility project involves the design and construction of several key components:

  • Administrative Facility: Includes administrative, support, infrastructure, equipment, communications, and storage spaces, built to Sensitive Compartmented Information Facility (SCIF) standards.
  • Commons Facility: Provides personnel support spaces such as a fitness center, full-service cafeteria, outdoor seating, unclassified conference rooms, and mechanical/electrical/telecom support.
  • Parking Structure: For privately-owned vehicles, including accessible parking, pedestrian access, and mechanical/electrical spaces.
  • Vehicle Control Point (VCP): Consists of an overhead canopy with two guard booths, inbound/outbound roadway, overwatch booth, rejection lane, and a new traffic circle connecting to the NSA-U site access road. Existing parking and roadways will be modified.

Contract Details

  • Delivery Method: Two Phase Design Build (DB)
  • Contract Type: Firm-Fixed Price (FFP)
  • Estimated Completion: 1,310 calendar days
  • Estimated Magnitude: $250,000,000 – $500,000,000
  • Product Service Code: Y1AZ (Construction Of Other Administrative Facilities And Service Buildings)

Industry Day Information (Post-Event)

The Virtual Industry Day, held on January 14, 2026, aimed to provide interested offerors with an understanding of the anticipated requirement and project timelines. This notice now includes the presentation slides and Q&A from the event.

Key Takeaways from Industry Day Materials:

  • Procurement Strategy: The project will be solicited as a Request for Proposal (RFP) on PIEE.
  • Acquisition Milestones: Estimated dates for Sources Sought Notice, Industry Day, bidder inquiries, proposal submissions, and award were presented.
  • Draft RFP: A draft RFP detailing Phase One evaluation factors is not currently available but will be posted on SAM.gov if released.
  • Project Labor Agreements (PLAs): Industry feedback indicated that mandating PLAs in Utah would significantly limit competition due to low unionization rates. The government is monitoring court decisions.
  • CMMC Requirements: A minimum of CMMC Level 2 is required for this project, though this could change.
  • Feedback Requested: Industry feedback was sought on topics such as US firm/citizen requirements, proposal preparation time, local effects, PLAs, and bonding.

Disclaimer

This Special Notice is for informational purposes only and does not constitute a solicitation. The Government is not responsible for any costs incurred by interested parties.

Contacts

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 3Viewing
Special Notice
Posted: Apr 13, 2026
Version 2
Special Notice
Posted: Jan 22, 2026
View
Version 1
Special Notice
Posted: Dec 16, 2025
View
USACE SPK Design Build (DB) Construction, NSA-U Consolidation Mission Facility, Utah-Virtual Industry Day | GovScope