USCG SITKA ALASKA Cutter Support Building Repair Heating System

SOL #: UCGPR51291PR260000073Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE KETCHIKAN(00035)
KETCHIKAN, AK, 99901, United States

Place of Performance

Sitka, AK

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

No set aside specified

Timeline

1
Posted
Jun 2, 2026
2
Submission Deadline
Jul 6, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG) Base Ketchikan is soliciting proposals for the Repair and Replacement of the Heating System at the Cutter Support Building in Sitka, Alaska. This combined synopsis/solicitation seeks a contractor to replace two hydronic heaters and associated components. Award will be made to the lowest priced technically acceptable/qualified contractor, contingent on funding. Proposals are due July 6, 2026.

Scope of Work

The primary objective is to replace two existing hydronic heaters and their associated components within the mechanical room of the Cutter Support Building at USCG Sitka. The scope includes:

  • Providing all necessary labor, materials, and equipment.
  • Safe removal of existing unit heaters and piping.
  • Furnishing and installing two new, in-kind hydronic unit heaters (e.g., Modine Model V 59S01 or equivalent) that meet or exceed performance specifications.
  • Installation of new shut-off valves, unions, and fittings.
  • Reconnection of new heaters to existing hydronic piping and electrical systems.
  • System refill, air purge, and a complete service and inspection of the boiler system.
  • Testing of new heaters to ensure full operation.
  • Site cleanup and debris removal.

Contract & Timeline

  • Opportunity Type: Combined Synopsis/Solicitation
  • Product Service Code: J045 - Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment
  • Place of Performance: USCG, 1480 Seward Ave, Sitka, AK 99835
  • Period of Performance: Work to commence within 5 business days of material arrival, with completion no later than 14 business days per boiler from the start of work. Long lead time items to be ordered upon Notice to Proceed.
  • Set-Aside: While no specific set-aside is declared in the metadata, the solicitation includes numerous Federal Acquisition Regulation (FAR) clauses related to small business preferences and requirements (e.g., HUBZone, SDVOSB, WOSB).
  • Proposal Due: July 6, 2026, 22:00 UTC.
  • Published: June 2, 2026.

Submission & Evaluation

Proposals will be evaluated based on the lowest priced technically acceptable/qualified contractor. Quotes must include all shipping costs to Sitka, AK, and be FOB DESTINATION ONLY. Invoices must be submitted electronically via the USCG Finance Center Website (using Invoice Routing Code SILC PCB-2) and the Invoice Processing Platform (IPP). A site walk will be held in June 2026; interested contractors must provide Real ID compliant documents for installation access. Contractors are responsible for site safety, cleanup, and compliance with all applicable regulations.

Key Requirements for Bidders

  • Compliance with various FAR, HSAR, and CGAP clauses, including those for System for Award Management (SAM) registration.
  • Proof of experience and qualifications.
  • Provision of manuals, instructions, and test results upon completion.
  • Work to be performed during standard business hours (7:00 am - 3:00 pm, Monday-Friday), with deviations requiring prior written approval.

Contacts

People

Points of Contact

DENO STAMOSPRIMARY
Contracting Officer Benjamin ReedySECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jun 2, 2026
USCG SITKA ALASKA Cutter Support Building Repair Heating System | GovScope