USCGC 270' Campbell Exhaust Insulation Install

SOL #: 70Z04026Q60326Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 3(00040)
BALTIMORE, MD, 21226, United States

Place of Performance

Curtis Bay, MD

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 16, 2026
2
Submission Deadline
Jul 1, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard, Surface Forces Logistics Center (SFLC) is soliciting quotes for the installation of exhaust insulation on the USCGC 270' Campbell. This is a combined synopsis/solicitation (RFQ) under FAR 12.6, with an anticipated award of a Firm Fixed Price Purchase Order. This opportunity is a Total Small Business Set-Aside. Quotes are due by July 1, 2026, at 10:00 AM Eastern.

Scope of Work

The contractor will provide all materials and labor for manufacturing and installing exhaust insulation blankets and pads for specific systems aboard the USCGC 270' Campbell. This includes:

  • Main Diesel Engine (MDE) Exhaust systems: Insulation for a portion of two MDE exhaust systems.
  • Ship Service Diesel Generator (SSDG) Exhaust systems: Insulation for two SSDG exhaust systems.
  • Emergency Diesel Generator (EDG) Exhaust system: Insulation for one EDG exhaust system.

Insulation must be installed after the respective exhaust piping, silencers, and flexible joints are in place, adhering to MIL-STD-769J or an equal industry standard. The external surface temperature of the exhaust piping must not exceed 130°F, with operating temperatures ranging from 32°F to 800°F. Detailed drawings, including materials lists and specifications for silencers (8" and 12" flange, 321 SS), are provided. A mandatory site survey is required prior to the start of work. Access to some drawings may be Export-Controlled, requiring Joint Certification Program (JCP) registration.

Contract Details

  • Solicitation Number: 70Z04026Q60326
  • Award Type: Firm Fixed Price Purchase Order.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Place of Performance: U.S. Coast Guard Yard, Curtis Bay, MD 21226.
  • Period of Performance: 4 weeks.
    • Tentative Ship Check: July 20-24, 2026.
    • Tentative Installation: March 1 - April 1, 2027.
  • Payment: Invoicing will be processed through https://www.ipp.gov (Net 30). Vendor assumes financial responsibility until the order is accepted.

Evaluation and Submission

  • Basis for Award: Best Value, considering technical requirements, adherence to deadlines, and price. Past performance will be reviewed for "responsibility" per FAR 9.1.
  • Required Submissions: Quotes must include PE-approved drawings if specified in the SOW, along with vendor information (Entity Name, UEI, Address, POC, Phone, Email).
  • Wage Determination: Bidders must comply with the Service Contract Act Wage Determination (No. 2015-4265, Revision 33) for Baltimore, MD, covering minimum wage rates and fringe benefits.
  • Quote Deadline: July 1, 2026, at 10:00 AM Eastern.
  • Submission Method: Email quotes to SK2 Kenneth Palmer at kenneth.t.palmer@uscg.mil. The email subject line must include "70Z04026Q60326".
  • Site Visit: To schedule a site visit, contact James O'Connell at James.S.O'Connell@uscg.mil.

People

Points of Contact

KENNETH PALMERPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Jun 16, 2026
USCGC 270' Campbell Exhaust Insulation Install | GovScope