USCGC Gasconade SSDG Control Panel replacement

SOL #: 70Z08526Q0002157Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 2(00085)
ALAMEDA, CA, 94501, United States

Place of Performance

Saint Louis, MO

NAICS

Ship Building and Repairing (336611)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Ship And Marine Equipment (J020)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 23, 2025
2
Submission Deadline
Jan 6, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Statement of Work (SOW)
Project Title: Replacement, Installation, and Calibration of CAT 10R-9661 - Kit ELEK GP Controller on both SSDG’s aboard CGC GASCONADE

  1. Background
    The purpose of this project is to replace both existing controllers on the cutters SSDG’s with the CAT 10R-9661 - Kit ELEK GP, ensuring proper installation and calibration in accordance with the manufacturer's instructions. This work is critical to maintaining the operational efficiency and reliability of the equipment.

  1. Contractor Furnished Equipment

Qty 2 – CAT Kit ELEK GP – 10R-6991

3. Scope of Work
The contractor shall provide all necessary labor, tools, equipment, and expertise to perform the following tasks:

  1. Removal of Old Controller:
    • Safely disconnect and remove the existing controllers from the equipment.
    • Ensure no damage is caused to surrounding components during removal.
  2. Installation of New Controller:
    • Install the CAT 10R-9661 - Kit ELEK GP controllers in accordance with the manufacturer's specifications.
    • Verify that all connections are secure and properly aligned.
  3. Calibration of Controller:
    • Calibrate the newly installed controllers per the manufacturer's instructions.
    • Ensure the controllers are functioning optimally and meets operational requirements.

4. Deliverables
The contractor shall provide the following:

  • Two fully installed and calibrated CAT 10R-9661 - Kit ELEK GP controllers.
  • Documentation of calibration settings and procedures performed.
  • A brief report confirming the successful completion of the work and equipment functionality.

5. Period of Performance
The work shall be completed within 5 business days from the start date agreed upon by the contractor and the project manager.

6. Location of Work
The work will be performed at CGC GASCONADE, 100 Arsenal Street, ST. Louis MO, 63118

7. Contractor Responsibilities
The contractor shall:

  • Comply with all safety regulations and standards during the execution of work.
  • Provide qualified personnel to perform the tasks outlined in this SOW.
  • Ensure all tools and equipment used are in good working condition.

8. Government Furnished Equipment (GFE)
None

9. Acceptance Criteria
The work will be considered complete when:

  • The old controllers have been removed without damage to the equipment.
  • The new controllers have been installed and calibrated per the manufacturer's instructions.
  • The equipment is fully operational and meets performance standards.

10. Points of Contact
Questions related to anything listed within this statement of work, or access to the ship should be directed to: MKCS Matt Morin, 571-607-9267, matthew.j.morin@uscg.mil

People

Points of Contact

Files

Files

Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Dec 23, 2025
USCGC Gasconade SSDG Control Panel replacement | GovScope