USCGC George Cobb Watertight doors and scuttles

SOL #: 70Z08526Q0023425Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 2(00085)
ALAMEDA, CA, 94501, United States

Place of Performance

CA

NAICS

Ship Building and Repairing (336611)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Ship And Marine Equipment (J020)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 9, 2026
2
Submission Deadline
Mar 23, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard is seeking proposals for the provision of watertight doors and scuttles for the USCGC George Cobb (WLM-564). This is a Combined Synopsis/Solicitation issued by the SFLC Procurement Branch 2. The requirement is set aside for Total Small Businesses. Proposals are due March 23, 2026.

Scope of Work

This opportunity requires the provision of seven (7) steel watertight doors and two (2) steel scuttles, all of new manufacture and fully compliant with specified drawings and specifications.

  • Doors (Total 7): Seven doors, 26" x 66" C.O., WEAT construction, with various configurations including right-hand (RH) and left-hand (LH) swing, hasp and staple, and with or without fixed lights (14" x 18" or 9" diameter). All doors must conform to USCG DWG FL-1602-89.
  • Scuttles (Total 2):
    • One 18" DIA C.O., RSD, QA, WT scuttle with internal toggle pin lock and 12" coaming, per NAVSEA DWG 803-1401890.
    • One 21" DIA C.O., RSD, QA, WT scuttle with hasp & staple and 12" coaming, per NAVSEA DWG 803-1401892. All items must be new manufacture and fully compliant with the referenced drawings and any specifications identified in the scope of work.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: J020 - Maintenance, Repair And Rebuilding Of Equipment: Ship And Marine Equipment
  • Required Delivery: Within 12 months of contract award.
  • Response Due: March 23, 2026, 3:00 PM UTC
  • Published: March 9, 2026

Place of Performance/Delivery

Required supplies shall be delivered to: ATTN: MKCS William Gentry USCGC GEORGE COBB (WLM-564) 1001 South Seaside Avenue San Pedro, CA 90731

Contact Information

For questions regarding the scope of work, direct inquiries to the Contracting Officer.

People

Points of Contact

Justin WooldridgeSECONDARY

Files

Files

Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 9, 2026
USCGC George Cobb Watertight doors and scuttles | GovScope