USDA Forest Service Lake Wedington Waterline Construction, ARKANSAS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting bids for the Lake Wedington Waterline Construction project in Fayetteville, Arkansas. This project involves the replacement of existing distribution lines and installation of a new potable water supply line. This is a Total Small Business Set-Aside with an estimated magnitude between $1,000,000 and $2,000,000. Bids are due April 24, 2026, at 10:00 AM CT.
Scope of Work
This project includes two main packages at the Lake Wedington Recreation Area:
- Package 001 (Distribution System): Complete replacement of existing distribution lines. This involves demolition of current lines and valves, and installation of approximately 16,000 linear feet of waterline (1-inch to 6-inch diameter) extending from the existing Forest Service 22,000-gallon water storage tank to the day-use area and campground.
- Package 002 (Supply System): Installation of a new potable water supply line, consisting of approximately 6,000 linear feet of 3-inch waterline from Krie Road to the existing Forest Service 22,000-gallon water storage tank.
Clarifications from the site visit notes detail requirements for silt fences, pipe backfill (aggregate for paved areas, native for others), a new 36-inch metal door for the Booster Pump Station, open cut trenching with asphalt replacement for crossings, and minimum 5-foot burial depth for creek crossings.
Contract Details
- Contract Type: Firm-Fixed Price.
- Magnitude: Between $1,000,000 and $2,000,000.
- Period of Performance: 270 days after award, with completion no later than January 29, 2027.
- Bonds: Performance and Payment Bonds (100% of original contract award price) are required within 5 days of award. A Bid Guarantee is also required.
- Acceptance Period: Offers must remain firm for 90 calendar days from the bid receipt date.
Eligibility & Submission
- Set-Aside: Total Small Business Set-Aside.
- NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction, with a small business size standard of $45 million.
- Evaluation: Award will be based on the lowest price, responsive/responsible offer.
- Submission: Bids must be emailed to steven.alves@usda.gov (cc: adam.doyle@usda.gov) by the deadline. Bidders are advised to call the Contracting Officer/Contracting Specialist to confirm receipt.
Key Dates
- Site Visit: March 10, 2026, 10:00 AM CT (RSVP by March 7, 2026) - Past
- Questions Deadline: March 27, 2026 - Past
- Bids Deadline: April 24, 2026, 10:00 AM CT