USDA Forest Service Lake Wedington Waterline Construction, ARKANSAS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service has issued an Invitation for Bid (IFB), Solicitation Number 12445126B0010, for Lake Wedington Waterline Construction in Fayetteville, Arkansas. This project involves the complete replacement of existing distribution lines and the installation of a new potable water supply line. The estimated magnitude of construction is between $1,000,000 and $2,000,000. This is a Total Small Business Set-Aside.
Project Scope
The project is divided into two packages:
- Package 001 (Distribution System): Demolition of existing lines and valves, and installation of approximately 16,000 linear feet of 1-inch to 6-inch waterline from the existing 22,000-gallon water storage tank to the day-use area and campground.
- Package 002 (Supply System): Installation of approximately 6,000 linear feet of 3-inch waterline from Krie Road to the existing 22,000-gallon water storage tank. Engineering clarifications, including updates to Schedule B of Items for LI001 and requirements for 2”-8” Schedule 40 PVC sleeving under all asphalt areas, have been issued via Amendment 003. Clarifications also detail silt fence requirements, pipe backfill, booster pump station door installation, and the need to contact Arkansas One Call (811) prior to excavation.
Contract Details & Timeline
- Contract Type: Firm-Fixed Price (IFB)
- Set-Aside: Total Small Business Set-Aside
- NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction (Size Standard: $45 million)
- Period of Performance: 270 days after award, with completion no later than January 29, 2027. This was corrected by Amendment 002.
- Site Visit: March 10, 2026, at 10:00 AM CT at Lake Wedington Rec Area entrance. RSVP requested by March 7, 2026, to Danny Sims (danny.sims@usda.gov).
- Questions Due: March 27, 2026. Submit via email to steven.alves@usda.gov (cc: adam.doyle@usda.gov) with subject "12445126B0010 QUESTION".
- Bids Due: April 24, 2026, at 10:00 AM CT. Submit via email to steven.alves@usda.gov (cc: adam.doyle@usda.gov) with subject "12445126B0010 BID_Co. Name". Bidders must call the CO/CS to confirm receipt.
- Offer Acceptance Period: 90 calendar days from bid receipt.
Submission & Evaluation
Award will be based on the lowest price, responsive, and responsible offer. Bidders must be registered and active in SAM.gov. Performance and Payment Bonds (100% of award price) and a Bid Guarantee are required. Contractors are responsible for providing sanitary facilities for onsite workers. All amendments must be acknowledged on SF30 and SF1442 and returned with the bid.