USDA Sink Hole Repair and Perimeter Security Enhancement at Parking Lot 9-Design/Build Services

SOL #: 12314426R0003Sources Sought

Overview

Buyer

Agriculture
Usda, Departmental Administration
USDA, OCP-POD-ACQ-MGMT-BRANCH-FTC
FORT COLLINS, CO, 80521, United States

Place of Performance

Washington, DC

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Repair Or Alteration Of Other Non Building Facilities (Z2PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 1, 2026
2
Response Deadline
Apr 10, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA is conducting a Sources Sought to identify Design/Build contractors for Sink Hole Repair and Perimeter Security Enhancement at Parking Lot 9 of the Jamie L. Whitten Building in Washington, DC. This project involves completing an existing rehabilitation, addressing sinkholes, and enhancing security. Responses are due April 10, 2026.

Scope of Work

The project requires Design/Build services to complete the rehabilitation of Parking Lot 9. Key components include:

  • Perimeter Security: Installation of bollards (Guardiar M50/P1 crash-rated) and granite curbs. Existing materials on site must be verified for reuse.
  • Parking Lot Resurfacing: General resurfacing of the lot.
  • Sink Hole Remediation: Investigation and remediation of sinkholes that appeared adjacent to a WMATA elevator, halting previous construction. The successful offeror must determine the full extent of sinkholes and prepare remediation approved by USDA and WMATA. Geotechnical engineers Langan investigated the sinkholes, and their report (Jan 28, 2026) will be provided.
  • Electrical and Landscaping: Integration of these elements into the design and build.
  • WMATA Coordination: Immediate engagement with WMATA engineering staff is crucial due to the Orange/Blue/Silver line running 6 feet below the parking lot.
  • Site Visit: A mandatory site visit is required before submitting a bid to verify quantities and suitability of stored materials.
  • Historic Preservation: The design approved in 2021 by Section 106 Historic Preservation authorities is unlikely to require major changes.

Contract & Timeline

  • Type: Sources Sought / Market Research (Design/Build Services)
  • Set-Aside: None specified
  • Response Due: April 10, 2026, by 6:00 PM ET
  • Published: April 1, 2026
  • Project Duration: Completion required within 8 months of contract award.
  • Construction Documents: April 16, 2021 documents will be included but require updates for site elevations and bollard height.

Response Instructions

Interested parties must complete the MS Forms Sources Sought notice available at: https://forms.office.com/g/D37b2AscFr.

Additional Notes

This is a Sources Sought notice for planning purposes and does not constitute a solicitation.

People

Points of Contact