USFS - Disaster, Lava Road Repair

SOL #: 127EAW26Q0017Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 6
Albuquerque, NM, 871023498, United States

Place of Performance

CA

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 10, 2026
2
Last Updated
May 1, 2026
3
Submission Deadline
May 12, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Forest Service (USFS), under the Department of Agriculture, is seeking quotations for Disaster, Lava Road Repair at the Shasta-Trinity National Forest, California. This is a Total Small Business Set-Aside for commercial items, issued as a Request for Quotation (RFQ). An amendment has been issued to provide responses to Request For Information (RFI) questions, clarifying scope and requirements. Quotes are due May 12, 2026, at 11:00 AM Pacific Time.

Scope of Work

This project aims to provide watershed resource structural improvements, reduce sediment delivery, improve system roads, and enhance public access. Key tasks include:

  • Obliterating 9.84 miles of roadway, including old roads due to new alignments.
  • Performing 10.85 miles of linear grading.
  • Reconditioning 10.46 miles of roadway.
  • Completing 8.75 acres of clearing and grubbing.
  • Constructing 269 rolling grade dips.
  • Placing 1,800 cubic yards of crushed aggregate. Forest Service road widths vary from 12-16 feet, and contractors are encouraged to conduct site visits. There is no supplied water source for this project.

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP)
  • Period of Performance: 180 calendar days after Notice to Proceed (NTP), with work commencing within 10 calendar days of NTP. Anticipated start date is June 1, 2026.
  • Set-Aside: Total Small Business Set-Aside (NAICS 237310, $45M size standard).
  • Quote Submission Deadline: May 12, 2026, 11:00 AM Pacific Time.
  • Requests for Information (RFIs) Deadline: May 1, 2026, 11:00 AM Pacific Time (RFI responses are now incorporated via Amendment A00001).
  • Offer Acceptance Period: 75 calendar days from quote due date.

Evaluation Criteria

Award will be made to the offeror representing the best value to the Government, based on:

  1. Technical Approach (most important factor)
  2. Past Performance
  3. Price

Key Requirements & Notes

  • Eligibility: Offerors must hold an active and valid California contractor's license appropriate for road repair work and have an active SAM.gov entity registration. Subcontractors also require valid CA licenses.
  • Site Visit: No organized site visit is scheduled; offerors may inspect the site at their convenience.
  • Administrative: Invoices must be submitted electronically via the Invoice Processing Platform (IPP). A mandatory virtual Post-Award Conference will be held within 10 days of award.
  • Subcontracting: The prime contractor must perform a significant portion of the work. Limits: single subcontractor ≤ 25% of total contract value; aggregate subcontracted work ≤ 75% of total contract value.
  • Compliance: Adherence to Davis-Bacon Act wage determinations, a Fire Plan, and specific technical specifications (FP-14) is required. Equipment must be cleaned to prevent invasive species.
  • Contact: Tanya Torres (tanya.torres@usda.gov).

People

Points of Contact

Tanya TorresPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 1, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View
USFS - Disaster, Lava Road Repair | GovScope